首页 | 本学科首页   官方微博 | 高级检索  
     检索      

戈壁土路基后期沉降预测方法及误差分析
引用本文:董辉,马一跃,聂志红,祝志恒.戈壁土路基后期沉降预测方法及误差分析[J].湘潭大学自然科学学报,2012,34(1):48-53.
作者姓名:董辉  马一跃  聂志红  祝志恒
作者单位:湘潭大学土木工程与力学学院;中南大学土木建筑学院;广东华路交通科技有限公司
基金项目:国家自然科学基金,湖南省教育厅计划项目
摘    要:各种沉降预测的研究已在软土路基进行,而对戈壁土路基这一特殊路基的沉降预测研究较少.以兰新第二双线新疆段工程实测沉降数据为研究对象,分别采用双曲线法、星野法、Asaoka法、GM(1,1)模型四种沉降预测方法,预测戈壁土路基的后期沉降并分析不同时间起点对预测结果的影响.研究表明,常用的双曲线法和Asaoka法的预测精度受预测时间起点影响较大,双曲线法建议恒载期5~6月后为时间起点,Asaoka法建议恒载期1~2月后为时间起点.不同时间起点对星野法和GM(1,1)模型影响较小,其中GM(1,1)模型预测结果最为精确.

关 键 词:戈壁土    双曲线法    星野法    Asaoka法    GM(1  1)模型

On Prediction Method and Accuracy of Post-Construction Settlement for the Gobi Roadbed on Lanxin Passenger Line
DONG Hui , MA Yi-yue , NIE Zhi-hong , ZHU Zhi-heng.On Prediction Method and Accuracy of Post-Construction Settlement for the Gobi Roadbed on Lanxin Passenger Line[J].Natural Science Journal of Xiangtan University,2012,34(1):48-53.
Authors:DONG Hui  MA Yi-yue  NIE Zhi-hong  ZHU Zhi-heng
Institution:1.College of Civil Engineering and Mechanics,Xiangtan University,Xiangtan 411105; 2.School of Civil and Architectural Engineering,Central South University,Changsha 410075; 3.Guangdong Hualu Limited Company of Traffic Science and Technology,Guangzhou 510400 China)
Abstract:A variety of studies about settlement prediction have been conducted in the soft soil ground but less study has been applied to the Gobi roadbed.Relying on the average sedimentation data in Lanxin railway embankment test section of the second double road,four settlement prediction models which are hyperbolic method,Hoshino method,Asaoka method,GM(1,1)model have been used to predict post-construction of the Gobi roadbed.The impact about different time point on the predicted results was analysed.The results show that Hyperbola method and Asaoka method of prediction accuracy influenced by the different time point.When using the hyperbolic method,the use of after five or six months of constant-load as the starting point is suggested.When using the Asaoka method,the use of after one or two months of constant-load as the starting point is suggested.The choice of different time point has little effect on the Hoshino method and GM(1,1) model.And the GM(1,1) model’s predictions is the most accurate.
Keywords:Gobi roadbed  hyperbolic method  Hoshino method  Asaoka method  GM(1  1) model
本文献已被 CNKI 万方数据 等数据库收录!
点击此处可从《湘潭大学自然科学学报》浏览原始摘要信息
点击此处可从《湘潭大学自然科学学报》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号