首页 | 本学科首页   官方微博 | 高级检索  
     

预制梁先简支后连续的优化施工
引用本文:许海涛,张伟. 预制梁先简支后连续的优化施工[J]. 科学之友, 2006, 0(7)
作者姓名:许海涛  张伟
作者单位:中国路桥集团公路一局一公司 北京100081(许海涛),河南省路桥工程集团有限公司第一工程处 河南450009(张伟)
摘    要:介绍河南郑州西南绕城高速公路No3合同段中贾鲁河大桥40m预制预应力钢筋砼箱梁——先简支后连续的优化施工,叙述了通过现浇中横梁及湿接缝把相邻跨的预制梁块连接成连续梁,再进行体系转换实现先简支后连续梁桥的做法,对简支梁与连续梁桥的特点进行了分析对比。

关 键 词:预制梁  先简支后连续  优化施工

On the Optimized Construction of Precast Beam
Xu Haitao,Zhang Wei. On the Optimized Construction of Precast Beam[J]. Friend of Science Amateurs, 2006, 0(7)
Authors:Xu Haitao  Zhang Wei
Abstract:The paper introduces the optimized construction of 40m precast prestressed reinforced concrete box beam of Jialuhe Bridge of south-west highway of zhengzhou city. Preast pieces are connected to be continuous beam by cast-in-place middle cross beam and wet joint to achieve the first simple supporting and late continuing. So it also compares simply supported beam with continuous beam bridge.
Keywords:precast beam  first simple supporting and late continuing  optimized construction
本文献已被 CNKI 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号