首页 | 本学科首页   官方微博 | 高级检索  
     检索      

长寨水电站工程上下坝址方案比选
引用本文:郝晓敏.长寨水电站工程上下坝址方案比选[J].科技情报开发与经济,2008,18(22):198-199.
作者姓名:郝晓敏
作者单位:水利部山西水利水电勘测设计研究院,山西太原,030024
摘    要:简要介绍了长寨水电站枢纽工程概况,分析了其兴建的必要性和可行性,重点探讨了坝型和坝线的选择及工程布置等问题。

关 键 词:水电站  坝址比选  工程布置

The Scheme Comparison of Upper and Lower Dam Sites of Changzhai Hydropower Station
HAO Xiao-min.The Scheme Comparison of Upper and Lower Dam Sites of Changzhai Hydropower Station[J].Sci-Tech Information Development & Economy,2008,18(22):198-199.
Authors:HAO Xiao-min
Institution:HAO Xiao-min
Abstract:This paper briefly introduces the general situation of the pivotal project of Changzhai Hydropower Station,analyzes the necessity and feasibility of constructing the pivotal project of Changzhai Hydropower Station,and probes into the selection of dam types and dam axis,and the project layout,etc.
Keywords:hydropower station  dam site selection  project layout
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号