地铁车站PBA洞桩法施工数值模拟研究
引用本文:王亮. 地铁车站PBA洞桩法施工数值模拟研究[J]. 湖北民族学院学报(自然科学版), 2012, 0(3): 346-350
作者姓名:王亮
作者单位:辽宁省交通高等专科学校
摘    要:以沈阳地铁一车站PBA洞桩法施工为背景,采用MIDAS-GTS岩土数值分析软件模拟PBA洞桩法的施工工艺;通过数值模拟结果的数据分析,研究PBA洞桩法施工时地表沉降、地层位移和地层应力的规律和特点;提出了PBA洞桩法的施工建议,为沈阳地区PBA洞桩法施工提供参考.

关 键 词:PBA洞桩法  数值分析  地表沉降  地层位移  地层应力

Numerical Analysis of Subway Station Construction with the PBA Cavern-Pile Method
WANG Liang. Numerical Analysis of Subway Station Construction with the PBA Cavern-Pile Method[J]. Journal of Hubei Institute for Nationalities(Natural Sciences), 2012, 0(3): 346-350
Authors:WANG Liang
Affiliation:WANG Liang (Liaoning College of Communications,Shenyang 110122,China)
Abstract:Taking the PBA cavern-pile method of Shenyang subway station construction as an example, this paper modified the PBA cavern-pile method construction technology with the numerical analysis software of MIDAS-GTS.Through the analysis of the numerical simulation data,the paper discussed the laws and characteristics of ground surface settlement,stratum displacement,and stratum stress with the PBA cavern-pile method construction,and put forward construction suggestions for PBA cavern-pile method,for reference of engineering technology personnel.
Keywords:PBA cavern-pile method  numerical analysis  ground surface settlement  stratum displacement  stratum stress