首页 | 本学科首页   官方微博 | 高级检索  
     

基于动态工作流系统的软件过程改进与控制
引用本文:蒋伟进,许宇晖. 基于动态工作流系统的软件过程改进与控制[J]. 解放军理工大学学报(自然科学版), 2012, 0(6): 625-629. DOI: -
作者姓名:蒋伟进  许宇晖
作者单位:1.湖南商学院 计算机与信息工程学院,湖南 长沙 410205;2.武汉理工大学 计算机科学与技术学院,湖北 武汉 430070; 3.湖南商学院 设计艺术学院,湖南 长沙 410205
基金项目:国家自然科学基金资助项目(61074067,21106036);科技部技术创新基金资助项目(09C2621430194);教育部人文社科研究一般规划基金资助项目(11YJAZH039);湖南省自然科学基金资助项目(10JJ5064,11JJ6051).
摘    要:针对软件过程改进存在的问题,提出了基于工作流仿真技术的思路。将工作流仿真贯穿到软件过程改进的整个生命周期。首先,提出了一个支持软件过程改进的动态工作流实施框架,其中包括4个反馈环节来实现改进;建立了指导建模的软件工作流元模型,它将度量和过程改进的几个要素结合到一起,便于仿真评价,并且利用对象约束语言形式化描述模型实体本身和实体间的完整性约束关系。其次,给出了基于ECA规则的工作流模型定义和仿真引擎的结构。第三,在上述基础上针对一个软件开发过程的实例,根据过程度量指标分析了多种可能的改进方案。

关 键 词:软件体系结构  软件过程改进  工作流仿真  ECA规则
收稿时间:2010-10-16
修稿时间:2010-10-16.

Workflow simulation for software process improvement
JIANG Wei-jin and XU Yu-hui. Workflow simulation for software process improvement[J]. Journal of PLA University of Science and Technology(Natural Science Edition), 2012, 0(6): 625-629. DOI: -
Authors:JIANG Wei-jin and XU Yu-hui
Affiliation:1.School of Computer and Information Engineering, Hunan University of Commerce, Changsha 410205, China;2.School of Computer Sci.& Tech.,Wuhan University of Technology,Wuhan 430070,China;3.School of Art Layout, Hunan University of Commerce, Changsha 410205, China
Abstract:Software process improvement(SPI) plays an important role in software engineering research. SPI's study can be grouped by different depth and breadth. In dimension of depth,SPI relates to the methodology, the technology and the tool. And in dimension of breadth,SPI comprises the process, the product, the resource, the organization and the metric. The framework for SPI based on workflow was presented.It consists of four feedback cycles for process improvement. A software workflow Meta modal that facilitates to guide modeling was given. It combines metrics and four process improvement elements, described formally by object constraint language. From the viewpoint of the tool, the workflow modal definition based on ECA rule and the architecture of simulation engine was given. Finally, an example about software development process was provided.Three improvement solutions were analyzed according to the process metrics.
Keywords:software frame  software process improvement  workflow simulation  ECA rule
点击此处可从《解放军理工大学学报(自然科学版)》浏览原始摘要信息
点击此处可从《解放军理工大学学报(自然科学版)》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号