首页 | 本学科首页   官方微博 | 高级检索  
     

黄河包头画匠营子取水工程泥沙预沉试验研究
引用本文:张淑英. 黄河包头画匠营子取水工程泥沙预沉试验研究[J]. 兰州理工大学学报, 1997, 0(1)
作者姓名:张淑英
作者单位:兰州铁道学院
摘    要:通过静态沉降试验对黄河水体泥沙的沉降特性进行了研究,得到了不同原型沙样的沉降曲线,确定了不同含沙量时的沉降速度和沉降历时,为预沉池的设计提供设计参数

关 键 词:沉降  悬浮液  预沉池  速度  去除率

Experimental study on silt pre sedimentation for the project of water drawing from the Yellow River at Huajiangyingzi,Baotou city
Zhang Shuying. Experimental study on silt pre sedimentation for the project of water drawing from the Yellow River at Huajiangyingzi,Baotou city[J]. Journal of Lanzhou University of Technology, 1997, 0(1)
Authors:Zhang Shuying
Abstract:An investigation of silt sedimentation characteristics of Yellow River waters through static sedimentation experiment and some sedimentation curves of different silt prototypes samples have been obtained. The sedimentation speed and time history of different silt content have been determined and thus a reference is provided for the design of pre sedimentation ponds.
Keywords:subsidence  suspension liquid  pre sedimentation pond  speed  removal rate  
本文献已被 CNKI 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号