浅谈双壁波纹管道施工过程控制
引用本文:李晓蕾.浅谈双壁波纹管道施工过程控制[J].科学之友,2008(8):18-19.
作者姓名:李晓蕾
作者单位:山西省电建三公司,山西,太原,030032
摘    要:文章详细阐述了双壁波纹管管道工程施工的整个流程,包括:测量放线、沟槽开挖、基础、管道安装及连接、检查井闭水试验、回填土等6道工序,并指出了在各个施工过程中应如何控制及注意的问题。

关 键 词:双壁波纹管道  施工过程  质量控制
文章编号:1000-8136(2008)03-0018-03

Production Technique of the Steam Distribution Box of ACC system in No.2 Power Generation Co. LTD. in Hancheng
Li Xiaolei.Production Technique of the Steam Distribution Box of ACC system in No.2 Power Generation Co. LTD. in Hancheng[J].Friend of Science Amateurs,2008(8):18-19.
Authors:Li Xiaolei
Institution:Zhang Xiaoyun
Abstract:This paper expounds the six procedures of double-wall corrugated pipeline construction including: measurement-line, trench excavation, foundation, plumbing installation and connection, water closed trial in checking well and back-filling and points out issues paid attention to in the whole construction process.
Keywords:double-wall corrugated pipes  construction process  quality control