首页 | 本学科首页   官方微博 | 高级检索  
     

神木双110井区非均质气藏井位优化部署技术
引用本文:祝金利. 神木双110井区非均质气藏井位优化部署技术[J]. 西南石油大学学报(自然科学版), 2020, 42(4): 83-94. DOI: 10.11885/j.issn.1674-5086.2019.12.05.01
作者姓名:祝金利
作者单位:中国石油集团长城钻探工程有限公司, 辽宁 盘锦 124010
基金项目:中国石油长城钻探公司科研项目重大专项(GWDC201802-08)
摘    要:神木气田双110井区地质条件复杂,储层非均质性强,井位部署及跟踪调整难度极大。2017-2019年长城钻探公司与长庆油田创新合作模式,充分发挥联合开发优势,以双110井区为目标,坚持地质工程一体化,精细地质研究,优化井位部署。为了保证开发效果,从地震、测井、录井、岩芯、试气等资料入手,开展构造特征、沉积相特征、砂体及有效储层分布规律研究,建立三维地质模型,优选含气富集区。在井型、井网论证的基础上,优化井位部署,最终实现“少井高产”。共完钻直/定向井208口,对比方案少钻37口井,静态I+II类井比例达84.0%,部署完成水平井15口,平均水平井长度1 433.5 m,砂岩钻遇率83.3%,获得良好的开发效果。

关 键 词:强非均质性  井位优化部署  地质工程一体化  双110井区  神木气田  
收稿时间:2019-12-05

Well Location Optimization Technology of Strong Heterogeneity Gas Reservoir in Shuang 110 Well Block of Shenmu Gas Field
ZHU Jinli. Well Location Optimization Technology of Strong Heterogeneity Gas Reservoir in Shuang 110 Well Block of Shenmu Gas Field[J]. Journal of Southwest Petroleum University(Seience & Technology Edition), 2020, 42(4): 83-94. DOI: 10.11885/j.issn.1674-5086.2019.12.05.01
Authors:ZHU Jinli
Affiliation:CNPC Great Wall Drilling Company, Panjin, Liaoning 124010, China
Abstract:The geological conditions of Shuang 110 Well Block are complex with strong heterogeneity, and it is difficult to predict, and to deploy the well location for tracking adjustment. From 2017 to 2019, Great Wall Drilling Company has been working together with Changqing Oilfield Company on an innovative basis, aiming to complete the construction of 1 billion cubic meters of production capacity in Shuang 110 Well Block of Shenmu Gas Field. Though integration of geology and engineering, fine geological research, and well location deployment optimization, we have the goal. In order to ensure development effect, we carried out researches on structural characteristics, sedimentary faces characteristics, sand body and effective reservoir distribution using seismic data, well logging and logging data and core and gas testing data, and a three-dimensional geological model has been established to optimize the gas bearing enrichment area. Based on the demonstration of well pattern, the well location is optimized. Finally the goal of fewer wells and higher yield is realized. Finally, 208 vertical / directional wells have been drilled, with 37 wells less than original plan. The proportion of static first and second level wells is up to 84.0%. The 15 horizontal wells have been deployed and completed. The average length of horizontal wells is 1 433.5 m, and the drilling rate of sandstone is 83.3%, which proves to be a good development results.
Keywords:strong heterogeneity  well location optimization and deployment  geology and engineering integration  Shuang110 Well Block  Shenmu Gas Field  
本文献已被 CNKI 等数据库收录!
点击此处可从《西南石油大学学报(自然科学版)》浏览原始摘要信息
点击此处可从《西南石油大学学报(自然科学版)》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号