首页 | 本学科首页   官方微博 | 高级检索  
     


The vertical shaft construction technology of cutter head transformation of large diameter shield
Authors:He Feng  Wang Ying  Wang Zhenfei  Wang Baiquan
Affiliation:Beijing Underground Diameter Project Department, China Railway Tunnel Group, Beijing 100045, China;Beijing Underground Diameter Project Department, China Railway Tunnel Group, Beijing 100045, China;Beijing Underground Diameter Project Department, China Railway Tunnel Group, Beijing 100045, China;Beijing Underground Diameter Project Department, China Railway Tunnel Group, Beijing 100045, China
Abstract:Taking vertical shaft construction of cutter transformation of the Beijing underground diameter shield for example, the design and construction of cutter structure transformation under complex boundary conditions for large diameter shield were discussed. Practice about how to ensure the structure safety of the shaft as well as well-coordinated shield construction was explored, and reliable solutions were provided successfully, which can provide reference for similar projects.
Keywords:large diameter shield   shaft transformation   complex underground condition
本文献已被 CNKI 等数据库收录!
点击此处可从《中国工程科学》浏览原始摘要信息
点击此处可从《中国工程科学》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号