首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Key technologies for the construction of the Xiluodu high arch dam on the Jinsha River in the development of hydropower in western China
Authors:Lu Youmei  Fan Qixiang  Zhou Shaowu  Li Bingfeng and Li Wenwei
Institution:China Three Gorges Corporation, Beijing 100038, China;China Three Gorges Corporation, Beijing 100038, China;China Three Gorges Corporation, Beijing 100038, China;China Three Gorges Corporation, Beijing 100038, China;China Three Gorges Corporation, Beijing 100038, China
Abstract:Hydropower development in China is concentrated in the country’s western regions.Among all the rivers in China,the lower course of the Jinsha River contains the richest hydro-energy resource,and therefore,4 mammoth hydropower plants are under construction on this particular section of the river at Wudongde,Baihetan,Xiluodu,and Xiangjiaba.The water-blocking structures of the hydropower facilities at Wudongde,Baihetan and Xiluodu are all arch dams of around 300 m high.In view of changes in the geological conditions at the foundation of the Xiluodu dam on the riverbed after excavation started,the designs of expanding foundation surface excavation and dovetailing the dam body and foundation rock on both upstream and downstream sides were introduced,allowing the arch dam and foundation to fit each other and improving the stress conditions of the dam body and foundation.By dividing the dam body into various concrete sections,the dynamic properties of concrete were adequately adjusted to the distribution of stress in the dam body.In addition,the use of the most optimal concrete material and mixture ratio allowed thermodynamics of concrete to satisfy the requirements of the strength,durability,temperature control and crack prevention of the concrete.Moreover,rigorous temperature control measures were introduced to prevent harmful cracking,thus enhancing the integrity of the arch dam.Furthermore,sophisticated construction machinery,scientific testing methods,and sound construction techniques were employed to ensure the uniformity and reliability of concrete placement.The "Digital Dam" for the Xiluodu project,which is based on the theory of total life cycle,has supplied strong support for construction process control and decision-making.
Keywords:high arch dam  key technologies  Xiluodu  hydropower development
本文献已被 CNKI 等数据库收录!
点击此处可从《工程科学》浏览原始摘要信息
点击此处可从《工程科学》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号