首页 | 本学科首页   官方微博 | 高级检索  
     检索      

铁矿排土场挡土坝稳定性数值分析
引用本文:梁力,张锋春,方国涛,董天文.铁矿排土场挡土坝稳定性数值分析[J].东北大学学报(自然科学版),2006,27(1):80-83.
作者姓名:梁力  张锋春  方国涛  董天文
作者单位:1. 东北大学,资源与土木工程学院,辽宁,沈阳,110004
2. 辽宁省交通勘测设计院,辽宁,沈阳,110005
摘    要:利用矢量化的某铁矿排土场边坡原地表地形图在AUTOCAD中形成原地表三维立体图.平面计算的模型为三维立体模型的剖面.在自重荷载的情况下考虑地下水的组合,用ANSYS有限元分析软件对32°边坡和挡土坝进行了简化为平面应变问题的应力和位移场的分析.排土场边坡位移都很大,这主要是因为排土场高度较大,变形较大是合理的;地表水和地下水的控制是提高排土场稳定性的极有效的措施.对挡土坝而言,主要关注坝踵区的应力状态和变形的大小与方向,同时根据材料的抗拉强度与实际拉应力的比值给出的可供参考的安全系数.在构筑了挡土坝的条件下32°坡角的排土场边坡是稳定的.在排土场边坡的坡脚修建挡土坝既有利于边坡的稳定性,又有利...

关 键 词:数值分析  挡土坝  边坡  排土场  ANSYS计算程序  
文章编号:1005-3026(2006)01-0080-04
收稿时间:2005-03-29
修稿时间:2005年3月29日

Numerical Analysis of Stability of Bulkhead Dam for Mining Junkyard in Iron Ore Stope
LIANG Li,ZHANG Feng-chun,FANG Guo-tao,DONG Tian-wen.Numerical Analysis of Stability of Bulkhead Dam for Mining Junkyard in Iron Ore Stope[J].Journal of Northeastern University(Natural Science),2006,27(1):80-83.
Authors:LIANG Li  ZHANG Feng-chun  FANG Guo-tao  DONG Tian-wen
Institution:(1) School of Resources and Civil Engineering, Northeastern University, Shenyang 110004, China; (2) Liaoning Communications Survey and Design Institute, Shenyang 110005, China
Abstract:A 3-D stereogram is given showing the primary topography in AUTOCAD, utilizing the vectorized primary relief map of the slope of a mining junkyard in a certain iron ore stope. Of which the 2-D model for calculation is a profile map of the 3-D model. Considering gravitationally the groundwater distribution, the finite element analysis of ANSYS software is used to simplify the 32° slope and bulkhead dam into a planar stress problem to analyze stress and displacement field. It is reasonable that the displacement of the junkyard slopes is great because the height of the yard is so big as well as its deformation. To control both the upland water and groundwater is a very effective measure to take for improving the stability of the junkyard. However, what is more important to the bulkhead dam is the magnitude and orientation of the stress and deformation in the dam heel region. A referable safety factor is thus given in accordance to the ratio of the tensile strength of dam material to the actual tensile stress. It has been proved in calculation that the 32° slope is stable if building a bulkhead dam on the slope foot, and the dam will provide the stability to the slope and bigger capacity to the yard.
Keywords:numerical analysis  bulkhead dam  slope  mining junkyard  ANSYS software
本文献已被 CNKI 万方数据 等数据库收录!
点击此处可从《东北大学学报(自然科学版)》浏览原始摘要信息
点击此处可从《东北大学学报(自然科学版)》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号