首页 | 本学科首页   官方微博 | 高级检索  
     

高速铁路引入大同枢纽方案研究
引用本文:李磊. 高速铁路引入大同枢纽方案研究[J]. 山西科技, 2010, 25(2): 30-31,33
作者姓名:李磊
作者单位:铁道第三勘测设计院集团有限公司线站处,天津市,300142
摘    要:根据大同铁路枢纽现状、车流特点及存在的问题,并结合大同铁路枢纽、城市总体发展规划和高速铁路自身的特点,对高速铁路引入枢纽后客运站的设置和分工进行了综合比选,得出在东王庄新建大同高速客运站较为合理的结论。

关 键 词:高速铁路  枢纽  方案

Plans of Introducing High-speed Railway into Datong Hub
LI Lei. Plans of Introducing High-speed Railway into Datong Hub[J]. Shanxi Science and Technology, 2010, 25(2): 30-31,33
Authors:LI Lei
Abstract:Considering the current situation,traffic characteristics and problems of Datong railway hub and the characteristics of Datong hub,the overall development plan of the city and high-speed railways,the paper compares the organization and division of the passenger station after the introduction of high-speed railway into Datong hub,and the result shows Dongwangzhuang is the comparatively more reasonable site of station.
Keywords:high-speed railway  hub  plan  
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号