首页 | 本学科首页   官方微博 | 高级检索  
     检索      

独塔斜拉桥(广东三水桥)的施工控制
引用本文:陈德伟,范立础.独塔斜拉桥(广东三水桥)的施工控制[J].同济大学学报(自然科学版),1997,25(1):23-28.
作者姓名:陈德伟  范立础
作者单位:同济大学桥梁工程系!上海,200092
摘    要:广东三水大桥为一大跨独桥不对称P.C.斜拉桥,文中介绍施工控制在三水大桥施工中的应用,并就大跨P.C.斜拉桥施工中的一些问题进行了讨论,最后给出了施工控制的结果。

关 键 词:斜拉桥  施工  控制

Construction Control of the Stayed Bridge with Single Pier
Chen Dewei, Fan Lichu, Xiang Haifan.Construction Control of the Stayed Bridge with Single Pier[J].Journal of Tongji University(Natural Science),1997,25(1):23-28.
Authors:Chen Dewei  Fan Lichu  Xiang Haifan
Abstract:In case of long-span bridges such as P. C. cable-stayed bridges, it isvery important to keep the construction accuracy during erection and on the time of closure. But there has been difficulty for P.C. cable-stayed bridges mainly because of the difference between the real structure and the ca1culating one. In this paper the authors present a successful erection control for a P.C.cable-stayed bridge, Sanshui Bridge, with a main span of 180m, situated in Sanshui City, Guangdong Province, by using our construction control system forP. C. cable-stayed bridges.
Keywords:Cable-stayed bridge  Erection  Control
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号