首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Cost Climate Survey Scale in Construction:Development and Empirical Research
Abstract:To develop the cost climate survey scale( CCSS) used in construction enterprises,the design concepts,principles and the process diagrams of CCSS are proposed.Through questionnaire investigation and expert interviews,314 projects are established and the CCSS that is made up of 7 dimensions framework and 30 levels is preliminarily determined.After categorized merger,pre-test analysis and multiple items refining,16 projects of CCSS are eventually compiled.In order to verify the credibility and validity of the CCSS,200 employees in Qinhuangdao construction company as the samples are tested.SPSS 21.0 is used to analyze the reliability,validity and rationality of level divisions,and Amos 22.0 is for analyzing the degree of model adaptation in this survey.Finally,the current cost climate situation of the construction site in the company is evaluated,the deficiencies of the cost culture of the construction site are pointed out.This study shows that strengthening the cost knowledge training has a significant positive effect on the cost climate cognition of the employees.Nevertheless,accumulation of work experience has a dual impact on that.The CCSS is not only an important foundation for the cost climate research and its theoretical development,but also the premise of the cost climate quantitative research.An appropriate CCSS,to some extent,can reflect the cognitive level of all kinds of employees in one enterprise and cost savings degree of the enterprise in a certain time.The development of CCSS reflects the originality and interactivity,and fills a blank of the CCSS in construction,which is considered to be an effective tool for cost climate research in construction.
Keywords:
本文献已被 CNKI 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号