6kV厂用电并列倒换时系统循环潮流分析
引用本文:王浩. 6kV厂用电并列倒换时系统循环潮流分析[J]. 科学之友, 2011, 0(3)
作者姓名:王浩
作者单位:山西神头第二发电厂;
摘    要:文章分析了山西省神头发电公司的52联变解环后,其双侧电源220kV和500kV通过远方同网运行方式下,Ⅲ期工程6kV厂用电仍有用并列倒换方式的可能性和必要性。

关 键 词:52联变解环  同网运行6kV厂用电  并列倒换  

The 6 kV Factory Uses Electricity Parallel Replacing System Circulation Tidal Current Analysis
Wang Hao. The 6 kV Factory Uses Electricity Parallel Replacing System Circulation Tidal Current Analysis[J]. Friend of Science Amateurs, 2011, 0(3)
Authors:Wang Hao
Abstract:Analyzing when the Shanxi shentou electricity generation company 52 tocontact transformer to relieve the ring net,its two-sided power source 220 kV and 500 kV through distant place same network work way,the third Phase 6 kVFactory Uses Electricity still used the parallel replacing way the possibility and the necessity.
Keywords:52 contact transformer relieving the ring net  work with a network  the 6 kV factory uses electricity  Parallel running replacing  