Task scheduling for multi-electro-magnetic detection satellite with a combined algorithm |
| |
Authors: | Jianghan Zhu Lining Zhang Dishan Qiu Haoping Li |
| |
Affiliation: | 1. Science and Technology on Information Systems Engineering Laboratory, National University of Defense Technology, Changsha 410073, P. R. China 2. Northern Electronic Equipment Institute, Beijing 100191, P. R. China |
| |
Abstract: | Task scheduling for electro-magnetic detection satellite is a typical combinatorial optimization problem. The count of constraints that need to be taken into account is of large scale. An algorithm combined integer programming with constraint programming is presented. This algorithm is deployed in this problem through two steps. The first step is to decompose the original problem into master and sub-problem using the logic-based Benders decomposition; then a circus combines master and sub-problem solving process together, and the connection between them is general Benders cut. This hybrid algorithm is tested by a set of derived experiments. The result is compared with corresponding outcomes generated by the strength Pareto evolutionary algorithm and the pure constraint programming solver——GECODE, which is an open source software. These tests and comparisons yield promising effect. |
| |
Keywords: | task scheduling   combined algorithm logic-based Benders decomposition combinatorial optimization constraint programming (CP) |
本文献已被 CNKI 维普 万方数据 等数据库收录! |
| 点击此处可从《系统工程与电子技术(英文版)》浏览原始摘要信息 |
|
点击此处可从《系统工程与电子技术(英文版)》下载免费的PDF全文 |