首页 | 本学科首页   官方微博 | 高级检索  
     检索      

浅议高墩柱翻模施工技术措施
引用本文:樊丽文.浅议高墩柱翻模施工技术措施[J].太原科技,2010(5):93-95.
作者姓名:樊丽文
作者单位:山西省河曲公路段,山西河曲,036500
摘    要:结合刘家寨大桥高墩柱的施工实际,从高墩柱翻模施工准备、施工工艺及质量控制措施、质量保证措施等方面对高墩柱翻模施工技术进行了阐述。

关 键 词:高墩柱  翻模施工  技术措施

Brief Discussion on Technical measures of Over-form Construction of High Pier Column
Fan Li-wen.Brief Discussion on Technical measures of Over-form Construction of High Pier Column[J].Taiyuan Science and Technology,2010(5):93-95.
Authors:Fan Li-wen
Institution:Fan Li-wen (Shanxi Hequ Highway Administrative Agency, Hequ 036500, China)
Abstract:In this paper, combining construction of high pier column of Liu jiazhai bridge, the author expounded construction technology of over-form construction of high pier column from over-form construction preparation, construction technology, measures of quality control and quality assurance.
Keywords:high pier column  over-form construction  technical measures
本文献已被 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号