浅谈后张法长线预应力施工的伸长值控制问题
引用本文:王大江.浅谈后张法长线预应力施工的伸长值控制问题[J].科学之友,2007(6):14-14,16.
作者姓名:王大江
作者单位:山西省交通建设工程监理总公司,山西太原030012
摘    要:后张法连续梁施工过程中,需对施工机具、工艺参数等认真分析,严格控制,确保预应力筋伸长值达到设计要求,有效应力正确分布;现根据笔者施工监理的体会浅谈伸长值的控制问题。

关 键 词:后张法预应力施工  伸长值  有效应力
文章编号:1000-8136(2007)06-0014-02

On the Elongation Value Control of Afterward Expansion Long Prestressing Construction
Wang Dajiang.On the Elongation Value Control of Afterward Expansion Long Prestressing Construction[J].Friend of Science Amateurs,2007(6):14-14,16.
Authors:Wang Dajiang
Institution:Wang Dajiang
Abstract:In the process of afterward expansion successive beam construction,it is necessary to analyses carefully and control construction machinery,technique parameter to make sure that the elongation value can meet requirement and effective stress is correctly distributed. The author discusses the control of elongation value according to what he learned from experience of construction supervision.
Keywords:afterward expansion prestressing construction  elongation value  effective stress