首页 | 本学科首页   官方微博 | 高级检索  
     检索      

李家峡水电站两相非恒定流数值计算
引用本文:郭仁东,那秀艳.李家峡水电站两相非恒定流数值计算[J].沈阳大学学报,2000,12(4):35-38.
作者姓名:郭仁东  那秀艳
作者单位:沈阳大学建筑与环境工程学院110044
摘    要:本根据李家峡水电站备用机组的尾水两相非恒定流问题,利用特征线差分方程进行数值计算。对上、下游水压力及水轮机转速的稳定性进行了分析,给出了交界面波动的影响范围。

关 键 词:李家峡水电  两相非恒定流  水击压力  数值计算  特征线差分方程  尾水隧洞  调压井

Computation of Two-Phase Transient Flow in Li Jia Xia Hydroelectric Power Plant
GUO Reny-Dong NA Xiu - Yan.Computation of Two-Phase Transient Flow in Li Jia Xia Hydroelectric Power Plant[J].Journal of Shenyang University,2000,12(4):35-38.
Authors:GUO Reny-Dong NA Xiu - Yan
Abstract:Based on the two - phase transient flow in the downstream tunnel system of spare turbo generator set of Lijia Xia difference equation of characteristics is applied to deal with this transient flow. In this paper, we analyse the water hammer pressures in the upstream conduit and downstream tunnel of the turbo - generator set and the stability of the turbine speed.The effect range of interface surging have been given in this paper.
Keywords:Lijia Xia hydroelectric power plant  two phase transient flow  water hammer pressure  
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号