首页 | 本学科首页   官方微博 | 高级检索  
     

基于堆场混合堆存的集装箱码头装船顺序优化模型
引用本文:张笑菊,曾庆成,杨忠振. 基于堆场混合堆存的集装箱码头装船顺序优化模型[J]. 系统工程理论与实践, 2016, 36(9): 2374-2382. DOI: 10.12011/1000-6788(2016)09-2374-09
作者姓名:张笑菊  曾庆成  杨忠振
作者单位:1. 大连海事大学 交通运输管理学院,大连 116026;2. 大连海事大学 综合交通运输协同创新中心,大连 116026
基金项目:国家自然科学基金(71370137,71431001);大连市杰出青年人才项目(2014J11JH128);辽宁省高等教育内涵发展专项资金(协同创新中心)(20110116104);中央高校基本科研业务费专项资金(3132016302)
摘    要:为提高集装箱码头同贝同步装卸中岸桥与场桥作业效率,降低集卡空驶,提出了一种新的码头堆场堆存方法,即进出口集装箱混合堆存策略.以最小化场桥装卸作业的移动时间及翻箱时间为目标,建立出口集装箱装船顺序优化模型,通过优化出口集装箱装船顺序,增加场桥双循环次数,提高岸桥作业效率.设计了求解模型的启发式算法,并利用算例验证了模型和算法的有效性,分析了不同堆场布局的影响.结果表明,混合堆存策略能有效提高场桥的作业效率,本文构建的模型为提高岸桥同贝同步装卸效率提供了依据.

关 键 词:集装箱码头  同贝同步装卸  场桥调度  出口箱装船顺序  混合堆存策略  
收稿时间:2015-08-24

Optimization model for loading sequence based on mixed storage strategies in container yards
ZHANG Xiaoju,ZENG Qingcheng,YANG Zhongzhen. Optimization model for loading sequence based on mixed storage strategies in container yards[J]. Systems Engineering —Theory & Practice, 2016, 36(9): 2374-2382. DOI: 10.12011/1000-6788(2016)09-2374-09
Authors:ZHANG Xiaoju  ZENG Qingcheng  YANG Zhongzhen
Affiliation:1. Transportation Management College, Dalian Maritime University, Dalian 116026, China;2. Collaborative Innovation Center for Transport Studies, Dalian Maritime University, Dalian 116026, China
Abstract:To increase the double cycling efficiency of quay cranes and yard cranes and decrease the unloaded distance of trucks, this paper proposed a mixed storage strategy in container yard. With the objective of minimizing moving time and rehandling time of yard cranes, a loading sequence optimization model for export containers is developed to increase dual cycles. Finally, we use a heuristic algorithm to solve the model and analyze the validity of our model and algorithm. The results show mixed storage strategies can increase the efficiency of yard cranes efficiently and our model of optimizing loading sequence for export containers contributes to increasing the double cycling efficiency of quay cranes.
Keywords:container terminal  double cycling  yard crane scheduling  export container loading sequence  mixed storage strategy
本文献已被 CNKI 等数据库收录!
点击此处可从《系统工程理论与实践》浏览原始摘要信息
点击此处可从《系统工程理论与实践》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号