考虑运营成本的收费公路Pareto有效BOT合同决策
引用本文:吕萍,李晴,宋吟秋.考虑运营成本的收费公路Pareto有效BOT合同决策[J].系统工程理论与实践,2015,35(7):1808-1815.
作者姓名:吕萍  李晴  宋吟秋
作者单位:1. 中国科学技术大学 管理学院, 合肥 230026;2. 中国科学院大学 管理学院, 北京 100190
基金项目:中国科学院知识创新工程重要方向性项目(Y32901MEB1)
摘    要:运营成本是进行收费公路BOT(build-operate-transfer)合同决策的重要影响因素.本文将持续变动的运营成本引入到收费公路BOT合同中,研究三个合同变量——特许期、定价和公路容量的决策.文章合理假设了运营成本的表达式,并根据其与社会福利的关系,确定了在特定公路容量时的最优公路寿命.接着将运营成本引入到确定Pareto有效BOT合同的双目标规划模型中,分析特许期、容量以及定价的决策,得出以下结论:最优特许期为整个公路寿命;针对特定的特许期,存在相应的最优容量与定价组合使得BOT合同Pareto最优;考虑运营成本之后合同的:Pareto有效优于之前.此外,文章系统分析了折现率和合同双方谈判能力对特许期、公路容量、定价和公路服务质量的影响.

关 键 词:建设-运营-转让(BOT)  收费公路  Pareto有效合同  运营成本  折现率  
收稿时间:2014-08-18

Pareto-efficient BOT contracts for road franchising with operating costs
L&#,Ping,LI Qing,SONG Yin-qiu.Pareto-efficient BOT contracts for road franchising with operating costs[J].Systems Engineering —Theory & Practice,2015,35(7):1808-1815.
Authors:L&#  Ping  LI Qing  SONG Yin-qiu
Institution:1. School of Management, University of Science and Technology of China, Hefei 230026, China;2. School of Management, University of Chinese Academy of Sciences, Beijing 100190, China
Abstract:Operating costs is an important factor of build-operate-transfer (BOT) contracts for road franchising. This paper introduced operating costs into a BOT contracts with considering its sustainability and variability. A dual-objective planning model was proposed based on three decision variables of a BOT contract, namely concession period, road capacity and pricing. Firstly, We assume it's expression reasonably. Analyzing the relationships between social benefits and operating costs, the optimal road life can be defined and solved. Then, through analyzing the dual-objective planning model, it is concluded that the optimal decision of the concession period should be the whole road life. And, when the optimal concession period was decided, the unique pair of optimal capacity and pricing can be determined. Also, the Pareto efficiency gets better than before. Additionally, this paper systematically revealed impacts on the concession period, road capacity, pricing and service quality produced by the discount rate and negotiation power of two contract parties.
Keywords:build-operate-transfer (BOT)  highway  Pareto-efficient contracts  operating costs  discount rate