首页 | 本学科首页   官方微博 | 高级检索  
     

语言实验室安装前的准备及竣工后的验收
引用本文:刘慧诚. 语言实验室安装前的准备及竣工后的验收[J]. 太原师范学院学报(自然科学版), 2006, 5(3): 133-135
作者姓名:刘慧诚
作者单位:太原师范学院,山西,太原,030012
摘    要:安装前的准备工作和竣工后的验收工作是影响语言实验室正常运行的两个重要因素.文章针对上述两点进行阐述.

关 键 词:语言实验室  安装前的准备  验收
文章编号:1672-2027(2006)03-0133-03
收稿时间:2006-06-14
修稿时间:2006-06-14

Preparation Before Installation of Language Lab and Acceptance After Completion
Liu Huicheng. Preparation Before Installation of Language Lab and Acceptance After Completion[J]. Journal of Taiyuan Normal University:Natural Science Edition, 2006, 5(3): 133-135
Authors:Liu Huicheng
Affiliation:Taiyuan Normal College,Taiyuan 030012 ,China
Abstract:Preparation before installation as well as check and acceptance after completion are two essential elements influencing smooth running of language laboratory. There mainly demonstrates the two above mentioned points, which is meant to have a discussion with my colleagues concerning quality, success equipment installation and operation of language laboratory.
Keywords:language laboratory    preparation before installation    check and acceptance
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号