The research and practice of major technological issues on design of Three Gorges Project |
| |
Authors: | Zheng Shouren Niu Xinqiang |
| |
Affiliation: | Zheng Shouren 1,Niu Xinqiang 2 (1.Changjiang Water Resources Commission,Wuhan 430010,China,2.Changjiang Institute of Survey,Planning,Design and Research,Changjiang Water Resources Commission,China) |
| |
Abstract: | The dam of Three Gorges Project is characterized by large flood discharge capacity,more outlets,complicated flood discharge and energy dissipation structure,and the stability of the bank powerhouse dam foundation is endangered by large gentle-dip structural plane of the bedrock due to the deep excavation of powerhouse at the dam-toe.For the dam body concrete,the durability requirement is high and the temperature control and crack prevention are difficult.The practical experience which could be used for refe... |
| |
Keywords: | Three Gorges Project structure design key techniques practice |