首页 | 本学科首页   官方微博 | 高级检索  
     检索      

引黄北干输水线路黄土湿陷性工程地质研究
引用本文:贾晓华.引黄北干输水线路黄土湿陷性工程地质研究[J].科技情报开发与经济,2009,19(30):139-141.
作者姓名:贾晓华
作者单位:山西省水利水电勘测设计研究院,山西,太原,030024
摘    要:黄土地基的湿陷性是引黄北干输水线路的主要工程地质问题。论述了黄土湿陷性的成因及其地基评价,并提出了处理措施。

关 键 词:引黄北干输水线路  黄土湿陷性  地质研究  

Research on the Loess Collapsibility Project Geology of Water Conveyance Line in the North Trunk of Yellow River Diversion Project
JIA Xiao-hua.Research on the Loess Collapsibility Project Geology of Water Conveyance Line in the North Trunk of Yellow River Diversion Project[J].Sci-Tech Information Development & Economy,2009,19(30):139-141.
Authors:JIA Xiao-hua
Abstract:The collapsibility of loess foundation is the main project geology problem of water conveyance line in the north trunk of Yellow River Diversion Project. This paper expounds the origin and foundation evaluation of loess collapsibility,and puts forward some treatment measures.
Keywords:water conveyance line in the north trunk of Yellow River Diversion Project  loess collapsibility  geological research  
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号