综放工作面过6m大断层施工技术研究与应用
引用本文:魏小东.综放工作面过6m大断层施工技术研究与应用[J].科技情报开发与经济,2011,21(29):207-209.
作者姓名:魏小东
作者单位:潞安矿业集团王庄煤矿 山西长治 046031
摘    要:介绍了综放工作面利用放炮与煤墙注浆、打锚杆加固等技术手段通过6m大断层的施工方法,并结合实践对过断层施工时的注意事项进行了阐述。

关 键 词:综放工作面  过断层施工  放炮  注浆  打锚杆加固

Study on and Application of the Construction Technology Adopted on the Fully Mechanized Coalface Crossing 6m Large Faults
WEI Xiao-dong.Study on and Application of the Construction Technology Adopted on the Fully Mechanized Coalface Crossing 6m Large Faults[J].Sci-Tech Information Development & Economy,2011,21(29):207-209.
Authors:WEI Xiao-dong
Institution:WEI Xiao-dong
Abstract:This paper introduces the construction technology adopted on the fully mechanized coalface passing 6 m large faults by using the methods of blasting and coal-wall grouting,and setting anchor-bolt for reinforcement,etc.,and connecting with the practice,expounds some matters needing attention in the construction crossing the faults.
Keywords:fully mechanized coalface  construction crossing faults  blasting  grouting  setting anchor-bolt for reinforcement  