首页 | 本学科首页   官方微博 | 高级检索  
     

The Optimization of Preventive Maintenance Scheduling for Production Machine of Production System in Finite Time Horizon
引用本文:韩帮军,潘军,范秀敏,马登哲. The Optimization of Preventive Maintenance Scheduling for Production Machine of Production System in Finite Time Horizon[J]. 东华大学学报(英文版), 2004, 21(1): 112-116
作者姓名:韩帮军  潘军  范秀敏  马登哲
作者单位:CIMinstitute,ShanghaiJiaotongUniversity,Shanghai,200030
基金项目:Natural Science Foundation of China (No. 59889505)
摘    要:The recursion relation of preventive maintenance (PM) cycle is built up concerning the concept of effective age and age setback factor proposed in this paper, which illustrates the dynamic relationship between failure rate and preventive maintenance activity. And the nonlinear optimal PM policy model satisfying the reliability constraints in finite time horizon following Weibull distribution is proposed. The model built in this paper avoids the shortcoming of steady analytical PM model in infinite time horizon and can be used to aid scheduling the maintenance plan and providing decision supporting for job shop scheduling.

关 键 词:预防性维护 故障因子 非线性优化 制造机床 有限时间层位

The Optimization of Preventive Maintenance Scheduling for Production Machine of Production System in Finite Time Horizon
HAN Bang-jun,PAN Jun FAN Xiu-mir MA Deng-zhe CIM institute,Shanghai Jiaotong University,Shanghai. The Optimization of Preventive Maintenance Scheduling for Production Machine of Production System in Finite Time Horizon[J]. Journal of Donghua University, 2004, 21(1): 112-116
Authors:HAN Bang-jun  PAN Jun FAN Xiu-mir MA Deng-zhe CIM institute  Shanghai Jiaotong University  Shanghai
Affiliation:CIM institute, Shanghai J iaotong University, Shanghai, 200030
Abstract:The recursion relation of preventive maintenance (PM) cycle is built up concerning the concept of effective age and age setback factor proposed in this paper, which illustrates the dynamic relationship between failure rate and preventive maintenance activity. And the nonlinear optimal PM policy model satisfying the reliability constraints in finite time horizon following Weibull distribution is proposed. The model built in this paper avoids the shortcoming of steady analytical PM model in infinite time horizon and can be used to aid scheduling the maintenance plan and providing decision supporting for job shop scheduling.
Keywords:Preventive maintenance   Age reduction factor  Finite time horizon   Failure rate
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号