首页 | 本学科首页   官方微博 | 高级检索  
     检索      

张峰水库输水工程总干后半段方案比选
引用本文:郝晓敏.张峰水库输水工程总干后半段方案比选[J].科技情报开发与经济,2007,17(35).
作者姓名:郝晓敏
作者单位:水利部山西水利水电勘测设计研究院,山西太原,030024
摘    要:通过对原输水工程初步设计方案的分析,对多个方案进行了比选,并确定了输水方案。

关 键 词:输水工程  方案比选  张峰水库

The Comparison and Selection of Schemes for the MainTrunk's Bottom Half of Water Conveyance Project of Zhangfeng Reservoir
HAO Xiao-min.The Comparison and Selection of Schemes for the MainTrunk''s Bottom Half of Water Conveyance Project of Zhangfeng Reservoir[J].Sci-Tech Information Development & Economy,2007,17(35).
Authors:HAO Xiao-min
Institution:HAO Xiao-min
Abstract:Through analyzing the preliminary design scheme of original water conveyance project,this paper makes comparison and selection of several schemes,and determines the water conveyance scheme.
Keywords:water conveyance project  scheme selection  Zhangfeng Reservoir
本文献已被 CNKI 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号