首页 | 本学科首页   官方微博 | 高级检索  
     

面向项目制造的复杂装配过程资源建模
引用本文:郭钢,徐建萍,罗妤. 面向项目制造的复杂装配过程资源建模[J]. 重庆大学学报(自然科学版), 2010, 33(12): 47-53
作者姓名:郭钢  徐建萍  罗妤
作者单位:重庆大学,机械工程学院,重庆,400044;重庆大学,机械工程学院,重庆,400044;贵州大学,管理学院,贵州,贵阳,550025;重庆大学,机械工程学院,重庆,400044;重庆科技学院,电子信息学院,重庆400050
基金项目:国家863/CIMS主题资助项目)2007AA04Z1B1)
摘    要:面向订单设计(engineering-to-order,ETO)制造企业由于其产品结构复杂,对制造过程的组织管理不同于一般产品的装配制造。在单件小批生产模式的基础上,采用项目管理方法满足复杂产品制造过程特征要求,建立面向产品最终装配的项目制造(project-based manufacturing,PM)计划管理模式。面向项目制造的分层网络计划方法将生产计划的对象从零部件转换为具有一定缓冲空间的装配单元,建立整个装配过程的资源-任务矩阵,实现资源与任务的关联以及资源负荷的追溯,为实现以项目产品为对象的计划与资源的匹配提供数据支持。

关 键 词:面向订单设计  项目制造  装配单元  资源-任务矩阵
收稿时间:2010-06-30

Manufacturing resource modeling of complexassembly process under project-based manufacturing
GUO Gang,XU Jian-ping and LUO Yu. Manufacturing resource modeling of complexassembly process under project-based manufacturing[J]. Journal of Chongqing University(Natural Science Edition), 2010, 33(12): 47-53
Authors:GUO Gang  XU Jian-ping  LUO Yu
Affiliation:College of Mechanical Engineering, Chongqing University, Chongqing 400044,P.R. China;College of Mechanical Engineering, Chongqing University, Chongqing 400044,P.R. China;School of Management, Guizhou University, Guiyang 550025, Guizhou,P.R. China;College of Mechanical Engineering, Chongqing University, Chongqing 400044,P.R. China;School of Electronic &Information Engineering , Chongqing University of Science and Technology, Chongqing 400050, P.R. China
Abstract:In an engineering-to-order (ETO) company, organization and management of manufacturing process is differ from common products because of the complexity of product. A project-based manufacturing (PM) planning model for product final assembly is proposed based on single-piece and small-batch production model so that the characteristics of complexity, specificity and high complex product manufacturing process can be met by means of projected-based manufacturing. The method of layered network planning under project-based manufacturing can transform the objects of planning from parts to assembly cell in the course of final assembly that has some time-based buffer for planning; simultaneously a resource-task matrix is build for the whole assembly process. The matrix can achieve the relatedness between manufacturing resources and assembly task, and follow the resources loads in order to realize the matching of planning and resource against project product.
Keywords:
本文献已被 CNKI 万方数据 等数据库收录!
点击此处可从《重庆大学学报(自然科学版)》浏览原始摘要信息
点击此处可从《重庆大学学报(自然科学版)》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号