首页 | 本学科首页   官方微博 | 高级检索  
     

水电站群装机容量四种优化分配方法
引用本文:万永华,袁聆钊. 水电站群装机容量四种优化分配方法[J]. 太原理工大学学报, 1990, 0(1)
作者姓名:万永华  袁聆钊
作者单位:武汉水利电力学院,太原工业大学
摘    要:本文针对水电站群装机容量优化分配问题,应用数学规划的四种优化技术,建立其数学模型,提出了相应的求解方法。通过实例计算,从费用函数特性、计算精度和计算机时等方面对各种方法进行了分析比较,认为动态规划法是水电站群装机容量优化分配的较好方法,并对其实用性作了评价。

关 键 词:装机容量  优化技术  最优分配

Four Methods of Optimal Distribution for Installed Capacity Among a set of Hydropower Plants
Wan Yonghua Yuan Linzhao. Four Methods of Optimal Distribution for Installed Capacity Among a set of Hydropower Plants[J]. Journal of Taiyuan University of Technology, 1990, 0(1)
Authors:Wan Yonghua Yuan Linzhao
Affiliation:Wan Yonghua Yuan Linzhao
Abstract:In this paper, four mathematical models for optimally distribut ting the installed capacity among a set of hydropower plants are established based on the optimal techniques of LP, NLP, IPand DP.By means of theoretical analysis and the case study, the feasibility and generality of these medols are proved.DYNAMIC PROGRAMMING is recommended as the best method for distribution of installed capacity among a set of Hydropower Plants.
Keywords:installed capacity  optimal techniques  optimum distribution  
本文献已被 CNKI 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号