赵庄坑口电厂加压泵站方案比选
引用本文:冯君明.赵庄坑口电厂加压泵站方案比选[J].科技情报开发与经济,2008,18(34):220-221.
作者姓名:冯君明
作者单位:水利部山西水利水电勘测设计研究院,山西,太原,030024
摘    要:根据地形、地质、水力、施工、经济、运行管理等条件,对山西省赵庄坑口电厂中村水库3个取水口的位置进行了比较,初选水库内取水位置为坝上游左岸200m的凹弯处,从技术经济和运行管理等方面对一级加压泵站和二级加压泵站进行了对比分析,得出推荐采用一级加压泵站方案的结论。

关 键 词:加压泵站  方案比选  中村水库  赵庄坑口电厂

Scheme Comparison of the Booster Pump Station of Zhaozhuang Pithead Power Plant
FENG Jun-ming.Scheme Comparison of the Booster Pump Station of Zhaozhuang Pithead Power Plant[J].Sci-Tech Information Development & Economy,2008,18(34):220-221.
Authors:FENG Jun-ming
Institution:FENG Jun-ming
Abstract:Based on the conditions of the landform, geology, hydraulic power, construction, economy, and operation and management, etc., this paper makes comparison of the locations of three water intakes of Shencun Reservoir of Zhaozhuang Pithead Power Plant, Shanxi Province, and selects initially the concave-bend place, 200 m away from the lest-bank of the dam upstream as the water intake place within the reservoir, and from the aspects of the technical economy and operational management, makes comparative analysis on the single-stage booster pump station and the two-stage booster pump station, and draws a conclusion that the scheme of the single-stage booster pump station is recommended for use.
Keywords:booster pump station  scheme comparison  Shencun Reservoir  Zhaozhuang Pithead Power Plant