首页 | 本学科首页   官方微博 | 高级检索  
     检索      

基于改进的层次分析法和接近理想点法的桥梁施工方案风险评价研究
引用本文:■孙建诚,任浩,蒋浩鹏,张伟丁.基于改进的层次分析法和接近理想点法的桥梁施工方案风险评价研究[J].科技促进发展,2021,17(2):347-353.
作者姓名:■孙建诚  任浩  蒋浩鹏  张伟丁
作者单位:河北工业大学土木与交通学院 天津 300401;大连海事大学道路与桥梁工程研究所 大连 116026
摘    要:桥梁工程建设具有施工周期长、施工环境差、系统调配复杂、资金流动量大的特点,需要准备大量的施工原料、机械、人力资源.因此,在桥梁施工过程中会面临自然环境、安全施工等多种风险的影响.为保证施工的顺利进行,本文建立了基于改造的层次分析法(Analytic Hierarchy Process,AHP)和接近理想点法(Technique for Order Preference by Similarity to an Ideal Solution,TOPSIS)的桥梁施工方案风险评价模型,通过对风险进行评价研究,提出最优施工方案,以减少施工风险,提高施工效率.

关 键 词:桥梁工程  优选模型  风险指标  层次分析  接近理想点算法
收稿时间:2020/5/30 0:00:00
修稿时间:2020/9/30 0:00:00

Risk Assessment of Bridge Construction Scheme Based on Improved Analytic Hierarchy Process And Near Ideal Point Method
SUN Jiancheng,REN Hao,JIANG Haopeng and ZHANG Weiding.Risk Assessment of Bridge Construction Scheme Based on Improved Analytic Hierarchy Process And Near Ideal Point Method[J].Science & Technology for Development,2021,17(2):347-353.
Authors:SUN Jiancheng  REN Hao  JIANG Haopeng and ZHANG Weiding
Institution:School of Civil Engineering and Communications, Hebei University of Technology, Tianjin 300401,Institute of Road and Bridge Engineering, Dalian Maritime University, Dalian 116026,School of Civil Engineering and Communications, Hebei University of Technology, Tianjin 300401
Abstract:Bridge engineering construction has the characteristics of long construction period, poor construction environment, complex system deployment and large amount of capital flow, requiring preparation of a large number of construction materials, machinery and human resources. Therefore, the construction will face the impact from natural environment, safe construction and other risks. In order to ensure the smooth construction, this paper establishes a risk evaluation model for bridge construction schemes based on the improved analytic hierarchy process (AHP) and the near ideal point method. Through the risk evaluation and research, the optimal scheme is proposed to reduce the construction risk and improve the construction efficiency.
Keywords:bridge engineering  optimization model  risk index  analytic hierarchy process(AHP)  near ideal point method
本文献已被 万方数据 等数据库收录!
点击此处可从《科技促进发展》浏览原始摘要信息
点击此处可从《科技促进发展》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号