首页 | 本学科首页   官方微博 | 高级检索  
     检索      

关于并列管道型机器排序的复杂性
引用本文:高润霞.关于并列管道型机器排序的复杂性[J].阜阳师范学院学报(自然科学版),2002,19(3):12-14,28.
作者姓名:高润霞
作者单位:安庆师范学院,安庆,246003
摘    要:考虑一个有两个功能部件的机器模型,每个部件要么是有序的,要么类似于管道并列的。关于这类机器模型的3个 NP-完成结果在1]中有所阐述。本文说明的是当先前限制因素和其他限制因素削弱时,这三个NP-完成结果仍然正确。

关 键 词:NP-完成  多功能部件机器  管道型机器  资源限制
文章编号:1004-4329(2002)03-0012-03

On the Complexity of Scheduling Problems for Parallal Pipelined Machines
Gao Runxia.On the Complexity of Scheduling Problems for Parallal Pipelined Machines[J].Journal of Fuyang Teachers College:Natural Science,2002,19(3):12-14,28.
Authors:Gao Runxia
Abstract:In a machine model with two functional units,each can be either sequential or pipelined. Three NP-completeness results on such machine model have been represented in1].It is shown in this article that the three NP-completeness results remain true when precedence constrants and other constraints are weakened.
Keywords:NP-completeness  Machines with several functional units  Pipelined machines  Resource constraints
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号