排序方式: 共有71条查询结果,搜索用时 15 毫秒
1.
地价监测点配置关系到城市地价水平的真实反映,影响到我国城市地价监测体系的系统性和规范性.提出以空间分层抽样技术为基础,首先确定城市地价监测点总量,然后选择一定的指标,分别确定地价监测点在城市内不同区域、不同用地类型、不同土地级别中的分布,经综合平衡,最后确定地价监测点配置方案.该模式解决了我国当前地价监测体系建立中如何配置监测点这一技术问题. 相似文献
2.
3.
4.
5.
6.
7.
Based on the failure rate and design features allocation method,considering the multiple influential factors which affect electric multiple unit( EMU) bogies,maintainability allocation on EMU bogie was presented by interval analytic hierarchy analysis and fuzzy comprehensive assessment. The maintainability allocation model was established. Weight based on the influence degree of each factor on maintenance was assigned. Fuzzy interval numbers were used to substitute real numbers and express uncertain information.The maintenance weighting factors for each subsystem were calculated by fuzzy comprehensive assessment. Then the allocation method was applied to EMU bogie. The results show that the method is feasible. The problem difficult to quantify for EMU bogie maintenance allocation is solved effectively. 相似文献
8.
9.
提出一种应用于多输入多输出MC-CDMA系统的功率、子带、码道自适应分配算法。发送端在总发射功率受限的条件下通过多用户间功率、子带和码道的分配最大化系统吞吐量。通过限制用户的最大码道数来实现用户之间的带宽公平性。和传统MC-CDMA系统资源分配算法比较,本算法的最大特点是综合考虑功率、子带、码道的三维优化。算法最终归结为一个约束优化问题并利用拉格朗日乘子法进行求解。计算机仿真验证了算法的有效性。 相似文献
10.
Dependent-Chance Goal Programming and an Application 总被引:3,自引:0,他引:3
Liu Baoding Gu JifaInstitute of Systems Science Acadcmia Sinica Beijing P.R. China 《系统工程与电子技术(英文版)》1993,(2)
This paper presents a dependent-chance goal programming (DCGP) and gives a successive factoring method to solve DCGP. We also discuss the application of DCGP in Qinhuangdao region for water supply and allocation. 相似文献