全文获取类型
收费全文 | 5448篇 |
免费 | 599篇 |
专业分类
系统科学 | 1073篇 |
理论与方法论 | 275篇 |
现状及发展 | 871篇 |
综合类 | 3828篇 |
出版年
2024年 | 1篇 |
2021年 | 1篇 |
2018年 | 727篇 |
2017年 | 732篇 |
2016年 | 430篇 |
2015年 | 30篇 |
2014年 | 3篇 |
2013年 | 2篇 |
2012年 | 258篇 |
2011年 | 950篇 |
2010年 | 814篇 |
2009年 | 454篇 |
2008年 | 506篇 |
2007年 | 762篇 |
2006年 | 2篇 |
2005年 | 41篇 |
2004年 | 121篇 |
2003年 | 149篇 |
2002年 | 55篇 |
2000年 | 1篇 |
1994年 | 2篇 |
1991年 | 3篇 |
1985年 | 2篇 |
1967年 | 1篇 |
排序方式: 共有6047条查询结果,搜索用时 15 毫秒
61.
Ju-liang ZHANG Jian CHENDepartment of Management Science EngineeringSchool of Economics Management Tsinghua University Beijing China. 《系统科学与系统工程学报(英文版)》2003,12(3):360-371
This paper investigates the impact of a secondary market, where retailers can buy and sell excessinventories, on the supply chain. We develop a two-period model with a single manufacturer and tworetailers. At the beginning of the first period the retailers order and receive products from themanufacturer, but at the beginning of the second period, they can trade surplus products betweenthemselves in the secondary market. We investigate the impact of the correlated dependence ofretailers' demand on both the quantity effect and the allocation effect under the secondary market.Lastly,we study potential strategies for the manufacturer to increase sales with the existence of thesecondary market. 相似文献
62.
LOGISTICS SCHEDULING: ANALYSIS OFTWO-STAGE PROBLEMS 总被引:4,自引:0,他引:4
This paper studies the coordination effects between stages for scheduling problems where decision-making is a two-stage process. Two stages are considered as one system. The system can be a supply chain that links two stages, one stage representing a manufacturer; and the other, a distributor It also can represent a single manufacturer, while each stage represents a different department responsible for a part of operations. A problem that jointly considers both stages in order to achieve ideal overall system performance is defined as a system problem. In practice, at times, it might not be feasible for the two stages to make coordinated decisions due to (i) the lack of channels that allow decision makers at the two stages to cooperate, and/or (ii) the optimal solution to the system problem is too difficult (or costly) to achieve.Two practical approaches are applied to solve a variant of two-stage logistic scheduling problems. The Forward Approach is defined as a solution procedure by which the first sta 相似文献
63.
An algorithm is given for computing in a very efficient way the topology of two real algebraic plane curves defined implicitly.The authors preform a symbolic pre-processing that allows us later to execute all numerical computations in an accurate way. 相似文献
64.
This paper develops the large sample properties of the solutions of the general estimating equations which are unbiased or asymptotically unbiased or with nuisance parameters for correlated data.The authors do not make the assumption that the estimating equations come from some objective function when we establish the large sample properties of the solutions.So these results extend the work of Newey and McFadden(1994) and are more widely applicable.Furthermore,we provide some examples to justify the importance of our work. 相似文献
65.
This paper gives a theoretical analysis for the algorithms to compute functional decomposition for multivariate polynomials based on differentiation and homogenization which were proposed by Ye,Dai,and Lam(1999) and were developed by Faugere,Perret(2006,2008,2009).The authors show that a degree proper functional decomposition for a set of randomly decomposable quartic homogenous polynomials can be computed using the algorithm with high probability.This solves a conjecture proposed by Ye,Dai,and Lam(1999).The authors also propose a conjecture which asserts that the decomposition for a set of polynomials can be computed from that of its homogenization and show that the conjecture is valid with high probability for quartic polynomials.Finally,the authors prove that the right decomposition factors for a set of polynomials can be computed from its right decomposition factor space. 相似文献
66.
This paper considers the mixed covolume method for the second-order elliptic equations over quadrilaterals.Superconvergence results are established in this paper on quadrilateral grids satisfying the h~2-parallelogram condition when the lowest-order Raviart-Thomas space is employed in the mixed covolume method.The authors prove O(h~2) accuracy between the approximate velocity or pressure and a suitable projection of the real velocity or pressure in the L~2 norm.Numerical experiments illustrating the theoretical results are provided. 相似文献
67.
This paper considers the nonstandard renewal risk model in which a part of surplus is invested into a Black-Scholes market whose price process is modelled by a geometric Brownian motion, claim sizes form a sequence of not necessarily identically distributed and pairwise quasi-asymptotically independent random variables with dominatedly-varying tails.The authors obtain a weakly asymptotic formula for the finite-time and infinite-time ruin probabilities.In particular,if the claims are identically distributed and consistently-varying tailed,then an asymptotic formula is presented. 相似文献
68.
In this paper, the joint production and recycling problem is investigated for a hybrid manufacturing and remanufacturing system where brand-new products are produced in the manufacturing plant and recycled products are remanufactured into as-new products in the remanufacturing facility. Both the brand-new products and remanufactured products are used to satisfy customer demands. Returns of used products that are recycled from customers are assumed to be stochastic and nonlinearly price-dependent. A mathematical model is proposed to maximize the overall profit of the system through simultaneously optimizing the production and recycling decisions, subject to two capacity constraints — the manufacturing capacity and the remanufacturing capacity. Based on Lagrangian relaxation method, subgradient algorithm and heuristic algorithm, a solution approach is developed to solve the problem. A representative example is presented to illustrate the system, and managerial analysis indicates that the uncertainties in demand and return have much influence on the production and recycling policy. In addition, twenty randomly produced examples are solved, and computational results show that the solution approach can obtain very good solutions for all examples in reasonable time. 相似文献
69.
Most inventory researches assume that production level can fluctuate arbitrarily. However, large fluctuation of the production
level in many firms may be much costly. This paper addresses the coordinating pricing and inventory control problem in a bounded
production system with uncertain yield, in which the production level is constrained between a maximum and minimum level in
each period and the price can be adjusted dynamically. We show that the optimal policy is the interval base-stock-list-price
policy. Also, we study the impact of the production bounds and uncertainty of the yield on the production system. Numerical
experiments are also performed to study the impact of parameters on the system. 相似文献
70.
Yutaka Baba 《系统科学与系统工程学报(英文版)》2010,19(4):496-503
We study an M/PH/1 queue with phase type working vacation and vacation interruption where the vacation time follows a phase
type distribution. The server serves the customers at a lower rate in a vacation period. The server comes back to the regular
busy period at a service completion without completing the vacation. Such policy is called vacation interruption. In terms
of quasi birth and death process and matrix-geometric solution method, we obtain the stationary queue length distribution.
Moreover we obtain the conditional stochastic decomposition structures of queue length and waiting time when the service time
distribution in the regular busy period is exponential. 相似文献