首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 15 毫秒
1.
1Introduction TheThreeGorgesProject (TGP)makesafeatureofalargeinvestment,alongconstructionperiod ,widely involv ingaspects,agreatdealofworkindataandinformationprocessingandacom plicatedmanagementsystem .Ascien tificandefficientmanagementsystemisurgentlyneededtomanagetheprojectinasystematic ,all roundandmodernmanner.TheChinaYangtzeThreeGorgesProjectDevelopmentCorporation(CTGPC)decidedtocooperatewithaCanadacounterpartinbuildingTGPMSbyintroducingmoderncomputerizedin formationtechnology…  相似文献   

2.
三峡枢纽工程施工规模巨大,施工强度高,技术复杂。针对施工期通航、长江截流、高强度土石方和混凝土施工、三期碾压混凝土围堰和双线五级船闸等诸多施工技术难题,工程采用了“三期导流、明渠通航、围堰发电”施工方案。文章重点介绍了施工导流、土石方和混凝土工程施工实践与主要创新成果。  相似文献   

3.
The construction of Three Gorges Project (TGP) is characterized by large construction scale,high construction intensity and complexity in technology.In view of various technical difficulties such as navigation in construction period,two river closures,high-intensity concrete and earth-rock construction,high-intensity construction and demolition of RCC (roller compacted concrete) cofferdam in stage III and immediate navigation of double-line five-step shiplock after impoundment of reservoir,the scheme of river diversion during construction is adopted,namely "diversion in 3 stages,open channel navigation and cofferdam power generation".The practice and innovation achievements in river diversion during construction as well as earth-rock and concrete construction are presented emphatically.  相似文献   

4.
三峡工程大坝为混凝土重力坝,坝顶高程185 m,最大坝高181 m,坝轴线全长2 309.5 m,分为泄洪坝段、厂房坝段、非溢流坝段、升船机坝段、临时船闸坝段、左导墙坝段和纵向围堰坝段。笔者着重从泄洪建筑物水力学、坝体分缝、电站引水压力管道布置及结构形式、坝基深层抗滑稳定、临时船闸封堵、坝基封闭抽排等方面对大坝结构设计进行了简要介绍。  相似文献   

5.
Behavior of Plastic Concrete Diaphragm Walls in Three Gorges Project   总被引:1,自引:0,他引:1  
IntroductionThesecondstagecoferdam,includingupstreamanddownstreamcoferdams,isoneofthekeystructureinThreGorgesProject.Thecofer...  相似文献   

6.
The dam of Three Gorges Project is a concrete gravity dam with the crest elevation of 185 m, the maximum height of 181m and dam axis length of 2 309.5 m. The dam consists of spillway, powerhouse, non-over flow, ship-lift, temporary ship-lock, left diversion wall and longitudinal cofferdam blocks. Some key techniques relating to dam structure design are presented, including hydraulics of flood discharge structure, dam joint design, layout and structural type of penstock, deep anti-sliding stability of dam foundation, reconstruction of temporary ship-lock and closed drainage and pumping of dam foundation.  相似文献   

7.
三峡水利枢纽工程是治理开发长江的关键性工程,承担着防洪、发电、航运等综合利用任务。工程建成后可确保荆江地区防洪标准不低于百年一遇,大大缓解长江中下游防洪压力,为经济建设发展迅速的华中、华东、华南地区提供巨大的能源支持,从根本上改善川江航运条件,同时枯季补偿调节可提高长江中游河段航道水深和改善航运条件。新时期,长江治理、开发与保护对三峡工程运行提出了新要求,如何优化水资源利用,实施科学调度,全面提升水库综合效益,是三峡工程今后面临的一项长期任务。  相似文献   

8.
The important role of Three Gorges Project (TGP) in the flood management of the Yangtze River Basin is summarized.The Optimal Regulation Schemes of the Three Gorge Reservoir is briefly described.The flood regulation effect of TGP is analyzed.Typical issues related to reservoir operation for flood regulation are discussed and suggestions are put forward for the future work.  相似文献   

9.
概述了三峡工程在长江流域防洪中的重要地位,简要介绍了《三峡水库优化调度方案》,结合2010年三峡工程实际防洪调度运行,分析了三峡工程的防洪调度效果,探讨了与水库防洪调度相关的几个问题,并对今后的工作提出建议。  相似文献   

10.
Abstract: As the most significant water project, the Three Gorges Project (TGP) was designed to take care of multiple objectives for water utilization such as flood control, power generation and navigation. The implementation of the project will improve the flood safety level of Jingjiang reach to more than 100-year return period, which will reduce greatly the flood risk at the mid-lower reaches of Changjiang River, produce huge quantity of energy for the central, east and south China, and improve significantly the navigation conditions of Chuanjiang River. Meanwhile, the operation of the TGP in dry season which will compensate the downstream water resources, will as well deepen the navigation channel and thus improve the navigation conditions in the middle river reach. With the increasing demands raised from various aspects of the society, new requirements will be made for the TGP for the purpose of harnessing, development and protection of the Yangtze River Basin. Therefore, it will be a long-term task for the operation of TGP on how to optimize the water resources utilization and implement an effective operation.  相似文献   

11.
三峡工程对生态与环境的影响,一直是国内外广泛关注的热点之一.三峡工程对生态环境有利也有弊,总体上是利大于弊.对不利的影响采取有效措施,就可以明显降低,使三峡工程永远造福于社会,永远造福于人民.  相似文献   

12.
Three Gorges Project (TGP),the largest water resources and hydropower project in the world with huge scale and complex techniques,has great comprehensive benefits mainly in flood control,power generation and navigation improvement.Through 17-year construction and practice,the project has been successfully completed.Some valuable experience from the successful construction of TGP has been gained for the management system and mechanism of hydropower project construction in China.Its construction management mode produces important influences on the management system of domestic capital construction.With combination of the construction management practice of TGP,the characteristics of management system and mechanism are summarized,and the suggestions on current hydropower development system and construction management mode are put forward.  相似文献   

13.
三峡工程是当今世界上最大的水利枢纽工程。作为人类技术与艺术高度融合的"中国纪念碑",它以自身"大"而"崇高"的形体特征表征着国人自强不息、奋发图强的豪迈气概,同时也体现出华夏民族勇于直面伟大工程负面效应的忧患意识和民族自信。聚焦于上述看似对立实则辩证统一的正、负两方面,本文主要从国画、油画、摄影等三种艺术门类具体呈现"视觉三峡"的存在状貌与人文内涵。  相似文献   

14.
举世瞩目的三峡水利枢纽工程是世界上规模最大的水电站,也是中国有史以来建设的最大型水利水电工程。2010年10月26日,三峡水库蓄水首次达到设计水位175 m,这标志着其防洪、发电、航运等各项功能达到设计要求。三峡工程从构想、论证、设计、建设至竣工全面投入运行历时近百年。当初兴建三峡工程的构想是如何提出的?三峡工程究竟起什么作用?存在什么分歧意见?是如何进行论证的?论证的结论怎样?这是许多人关心而又不太了解的,笔者在文中做了扼要的介绍,以纪念世纪之梦的实现。  相似文献   

15.
简要介绍三峡工程建设概况,对三峡工程中所涉及到的水力学及河流动力学、土力学及岩石力学、结构力学、爆破力学等主要力学问题进行综述.  相似文献   

16.
无损检测技术是一种新型的混凝土质量检测方法,与传统钻孔检查方式相比,具有快速、准确、费用低等特点.在三峡工程泄洪坝混凝土质量检查中,首次大规模采用了无损检测技术,在检测出的缺陷区域内,通过灌浆孔检查资料与无损检测成果验证分析表明,无损检测技术能有效地查清混凝土缺陷性状及范围,说明混凝土无损检测技术是检测大体积混凝土质量的有效方法,可作为混凝土质量检测的一种手段.  相似文献   

17.
在归纳总结三峡工程移民信访工作的成绩和做法的基础上,分析了当前三峡工程移民信访反映的主要问题、信访特点及信访原因,进行了移民信访工作的思考,提出了在三峡工程后续工作新时期搞好移民信访工作的建议。  相似文献   

18.
The world-famous Three Gorges Project (TGP) is the largest hydropower station in the world and the largest water resources and hydropower project constructed in China.The impoundment of Three Gorges Reservoir reached the design water level of 175 m for the first time on October 26,2010,which indicated that the project had met design requirements of various functionalities of flood control,power generation and navigation.To complete the project it took nearly 100 years for conception,demonstration,design and construction of the TGP.How was the conception of TGP proposed? What kind of role should it be? What were the different opinions? How was the project demonstrated? What was the conclusion of demonstration? Those are the issues that many people care and don’t know about.To memorize the realization of the century dream of Chinese people and to record the history of development of TGP,the author presents a compendious introduction to the project.  相似文献   

19.
高压喷射灌浆防渗技术在三峡工程中的应用   总被引:2,自引:0,他引:2  
对高压喷射灌浆防渗技术在三峡工程一期土石围堰中的成功应用作了全面的介绍,详细阐述了其施工布置、施工主要参数、施工程序和施工方法.工程实践证明高压摆喷防渗技术在三峡全风化花岗岩中是切实可行的,防渗可以得到保证.该技术的成功应用为相关工程提供了借鉴和参考.  相似文献   

20.
三峡工程施工区生活垃圾无害化处理研究   总被引:1,自引:0,他引:1  
根据三峡工程施工区环境保护的要求,分析了三峡工程施工区生活垃圾的特性,结合城市生活垃圾无害化处理的三种方法,提出了采用卫生填埋法处理施工区的生活垃圾.此外,对垃圾填埋场的选址及工程设计要求进行了研究.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号