共查询到3条相似文献,搜索用时 0 毫秒
1.
2.
讨论一类具有随机加工时间的单机调度问题,所有工件设置一个公共交货期窗口,每个工件的加工时间服从正态分布,目标是确定n个独立工件的一个排序,使工件的提前/延期之和与完工时间之和的线性组合之期望值最小。问题的最优解具有v-型特征。 相似文献
3.
Huang Decai College of information Engineering Zhejiang University of Technology Hangzhou P. R. China 《系统工程与电子技术(英文版)》2001,12(2)
1. INTroDUCTIONThe emergence of JIT (Just in Time) management tee~gy opens up a recency research field for the jobscheduling and production managemellt. As its farther develOPment, the earnness-tardiness job schedulingproblem becomes a hot research point over y6ars. conference [1] gives a review on job scheduling problem withearnness and tardiness penalties. Reference [2] p~s another scheduling problem for minimizing the rangeof lateness on a single machine, and reference [3] giVes a he… 相似文献