首页 | 本学科首页   官方微博 | 高级检索  
     

BIM情境下综合设施管理服务供应商激励契约
引用本文:汤洪霞,曹吉鸣,邵志国. BIM情境下综合设施管理服务供应商激励契约[J]. 系统管理学报, 2021, 30(4): 643-652. DOI: 10.3969/j.issn.1005-2542.2021.04.004
作者姓名:汤洪霞  曹吉鸣  邵志国
作者单位:1.同济大学经济与管理学院;可持续发展与新型城镇化智库,上海 200092;2.青岛理工大学 管理工程学院,山东 青岛 266520
基金项目:国家自然科学基金资助项目(71874123,71974122);教育部人文社会科学研究青年基金资助项目(17YJC630184)
摘    要:为有效激励综合设施管理(IFM)服务供应商应用BIM进行IFM外包服务,实现BIM在IFM过程中的应用价值与IFM项目绩效,基于委托代理理论,针对IFM外包BIM应用过程中IFM服务供应商需要执行的BIM系统运营服务和IFM业务咨询服务两项任务,构建多任务委托代理模型;依托模型,分析在两项服务任务成本相互独立、相互依存...

关 键 词:BIM情境  综合设施管理  服务供应商  激励模式  激励契约

Incentive Contracts for Integrated Facility Management Service Supplier in BIM Context
TANG Hongxia,CAO Jiming,SHAO Zhiguo. Incentive Contracts for Integrated Facility Management Service Supplier in BIM Context[J]. Systems Engineering Theory·Methodology·Applications, 2021, 30(4): 643-652. DOI: 10.3969/j.issn.1005-2542.2021.04.004
Authors:TANG Hongxia  CAO Jiming  SHAO Zhiguo
Affiliation:1. School of Economics and Management; Sustainable Development and New Urbanization Think-Tank, Shanghai 200092, China; 2. School of Management Engineering, Qingdao University of Technology, Qingdao 266520, Shandong, China
Abstract:In order to effectively motivate integrated facility management (IFM) service suppliers to apply building information modeling (BIM) for IFM outsourcing service and realize the application value of BIM in the IFM process and the IFM project performance, a multi-task principal-agent model is built on IFM service suppliers’ two service tasks of BIM system operation and IFM business consulting during IFM outsourcing with BIM application based on the principal-agent theory. Relying on this model, the incentive contracts are analyzed in the three incentive modes in which the cost of the two service tasks is independent, interdependent, and interchangeable. Combining with the model calculation and MATLAB simulation results, the optimal incentive mode and its incentive contract are identified. The research shows that incentive contracts in the different modes have different incentive effects on IFM service suppliers, and have different impacts on the IFM outsourcing performance of owners. The optimal incentive contracts in the three incentive modes are ranked from high to low as the optimal incentive contract in the cost interdependent mode, the optimal incentive contract in the cost independent mode, and the optimal incentive contract in the cost interchangeable mode. Owners should select the suitable incentive model and contract to incentivize IFM service suppliers, and as the service capability and IFM project performance increase, the incentive from owners increase.
Keywords:BIM context  integrated facility management (IFM)  service supplier  incentive model  incentive contract  
本文献已被 CNKI 等数据库收录!
点击此处可从《系统管理学报》浏览原始摘要信息
点击此处可从《系统管理学报》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号