首页 | 本学科首页   官方微博 | 高级检索  
     检索      

矿井通风设施外部漏风的检测方法研究
引用本文:焦殿志,彭辉,王建军,朱峰,王志亮.矿井通风设施外部漏风的检测方法研究[J].华北科技学院学报,2012,9(3):31-35.
作者姓名:焦殿志  彭辉  王建军  朱峰  王志亮
作者单位:1. 安徽皖北煤电集团公司五沟煤矿,安徽淮北,235157
2. 华北科技学院安全工程学院,北京东燕郊,065201
基金项目:中央高校基本科研业务费资助
摘    要:矿井外部漏风率大小是衡量主要通风机运行状况和通风管理水平的重要指标之一,其测定方法的选择是现场技术人员进行漏风测定时面临的首要问题。依据矿井通风原理,分析了各种外部漏风测试方法的原理、步骤、适用条件。以五沟煤矿外部漏风测定为实例,论述其方法选择的依据和过程。现场测试结果表明:在1#风机和2#风机运行状态下矿井外部漏风率分别为8.4%和7.85%,其中备用风机的装置漏风是主要的漏风源,必须采取有针对性的措施予以治理。测试结果对消除矿井漏风隐患、优化矿井通风系统提供科学的现场依据。

关 键 词:外部漏风率  测定方法  漏风源  通风设施

Research on mensuration method of ventilation equipment external air leakage
JIAO Dianzhi PENG Hui,WANG Jianjun,ZHU Feng,WANG Zhiliang.Research on mensuration method of ventilation equipment external air leakage[J].Journal of North China Institute of Science and Technology,2012,9(3):31-35.
Authors:JIAO Dianzhi PENG Hui  WANG Jianjun  ZHU Feng  WANG Zhiliang
Institution:1. Wugou coal mine Anhui wanbei coal and electricity group, Huaibei Anhui 235157; 2. Safety Engineering College, North China Institute of Science and Technology, Yanjiao Beijing - East 101601 )
Abstract:It is one of signify indexes to evaluate running status of main fan and mine ventilation management level for external air leakage ratio, and the selection of mensuration methods is the chief issue for technique personnel when mensurating external air leakage. In term of coal mine ventilation theory, those characteristics were analyzed for various mensuration methods such as the principle, process, and applying condition. As a example of external air leakage mensuration of wugou mine, the gist and process of selecting mensuration methods was discussed. The resuh showed that mine external air leakage ratio was 8.4% and 7. 85% re- spectively corresponding 1^ # fan and 2^# fan running, equipment air leakage of spare fan was the most primary air leakage fountain- head, so specific measures must be applied to reduce air leakage. The research conclusion will provide scientific field reference for eliminating air leakage hidden trouble and optimizing mine ventilation system.
Keywords:external air leakage ratio  mensuration method  air leakage fountainhead  ventilation equipment
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号