首页 | 本学科首页   官方微博 | 高级检索  
     检索      

莱钢炼钢厂4#转炉TCO终点控制系统设计及研究
引用本文:宋文杰,郭群,张年刚,王素荣.莱钢炼钢厂4#转炉TCO终点控制系统设计及研究[J].科技信息,2009(5):41-41,56.
作者姓名:宋文杰  郭群  张年刚  王素荣
作者单位:莱芜钢铁集团自动化部;
摘    要:4#转炉TCO终点控制系统包括A、B两个上料汽缸投掷设备,触点缸、翻转缸、溜槽口以及TCO探头。转炉TCO终点控制系统可达到副枪检测控制的同等效果,有效地提高吹炼终点双命中率,缩短冶炼周期,降低各种消耗,提高钢质量。

关 键 词:TCO  终点控制  双命中率

The 4# Converter TCO Destination Controlling System of Steel Plant of LaiWu Iron and Steel Ltd. of Corp
Automation.The 4# Converter TCO Destination Controlling System of Steel Plant of LaiWu Iron and Steel Ltd. of Corp[J].Science,2009(5):41-41,56.
Authors:Automation
Institution:Automation department of LaiWu iron , steel Ltd. Of Corp. Laiwu Sh,ong 271104
Abstract:The cylinder 4 # converter TCO destination controlling system includes A ,B material throwing equipment and the contacting jar,overturning jar ,chuting mouth and TCO detector. The converter TCO destination controls system but reaches the equal effect that subsidiary gun checking controlers,improving two blowing destination hit rate ,shortening smelt period ,and reducing various consumption ,improving steel mass effectively.
Keywords:TCO  Controlling of the destination  Two hit rate  
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号