首页 | 本学科首页   官方微博 | 高级检索  
     检索      

地铁穿越既有桥梁主动顶升监测系统研究
引用本文:王佳妮,牛晓凯,薛忠军,苏洁.地铁穿越既有桥梁主动顶升监测系统研究[J].科学技术与工程,2013,13(26):7903-7910.
作者姓名:王佳妮  牛晓凯  薛忠军  苏洁
作者单位:北京交通大学 土木建筑工程学院,北京市重大项目建设指挥部办公室,北京交通大学 土木建筑工程学院,北京市市政工程研究院,北京市道路工程质量监督站,北京交通大学 土木建筑工程学院
基金项目:国家自然科学基金项目(面上项目,重点项目,重大项目)
摘    要:随着我国城市轨道交通建设的快速发展,地铁施工穿越既有桥梁的工程项目与日俱增,为确保既有桥梁在地铁施工期间的运营安全,桥梁上部结构主动顶升技术逐渐被推广应用。由于该项技术的特殊性,在具体实施过程中必须对桥梁结构进行实时动态监测,以此了解桥梁结构在顶升过程中及后续地铁施工过程中的受力变化状况,从而及时了解桥梁结构损伤位置及程度,进而对桥梁结构的安全状况做出评价,并提出有效处理措施。重点阐述主动顶升的适用范围和技术要求,针对性地提出地铁穿越工程的主动顶升监测系统,明确监测的设计流程和重点,并在实际的工程中进行了成功应用。

关 键 词:地铁工程  桥梁工程  主动顶升技术  结构监测  监测系统设计
收稿时间:2013/5/15 0:00:00
修稿时间:2013/5/15 0:00:00

Research on the Monitoring System of Initiative Jacking up
WANG Jiani,NIU Xiaokai,and SU Jie.Research on the Monitoring System of Initiative Jacking up[J].Science Technology and Engineering,2013,13(26):7903-7910.
Authors:WANG Jiani  NIU Xiaokai  and SU Jie
Institution:WANG Jia-ni;NIU Xiao-kai;XUE Zhong-jun;SU Jie;School of Civil Engineering,Beijing Jiaotong University;Beijing Major Projects Construction Headquarters Office;Beijing Municipal Engineering Research Institute;Beijing Road Engineering Quality Supervision Station;
Abstract:With the rapid development of urban rail transit construction in China, projects of increase. In order to ensure the operational safety of existing bridges during the subway construction, the initiative jacking up technology of bridge superstructure is gradually being spread and applied. Due to the speciality of the technology, we must do real-time dynamic monitoring for the structure of existing bridge during implementation. So as to understand the force changes of the bridge structure during lifting and the follow-up subway construction. Thus we can keep abreast of damage location and extent of the bridge structure, and then evaluate the security situation of the bridge structure, finally come up with effective measures. This article focuses on the scope of application and technical requirements of the initiative jacking up technology, and put forward the of subway crossing project, with clear monitoring design process and emphasis. This technology has been successfully applied in actual project.
Keywords:subway engineering  bridge engineering  initiative jacking up technology  structural monitoring  monitoring system design
本文献已被 CNKI 等数据库收录!
点击此处可从《科学技术与工程》浏览原始摘要信息
点击此处可从《科学技术与工程》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号