首页 | 本学科首页   官方微博 | 高级检索  
     检索      

水电站实时自动发电控制的新算法
引用本文:王定一.水电站实时自动发电控制的新算法[J].华中科技大学学报(自然科学版),1987(3).
作者姓名:王定一
作者单位:华中工学院电力工程系
摘    要:本文提出用动态规划法与等微增率法相结合、以开停机指标数确定运行机组台号的水电站自动发电控制(AGC)新算法,以满足在线实时运行的要求.文中介绍了该法的简易方案在新丰江水电站上应用情况.

关 键 词:发电  动态规划  优化  实时控制  计算机控制  水电站运行  控制算法

A New Algorithm for Real-Time Automatic Generation Control of Hydropower Plants
Wang Dingyi.A New Algorithm for Real-Time Automatic Generation Control of Hydropower Plants[J].JOURNAL OF HUAZHONG UNIVERSITY OF SCIENCE AND TECHNOLOGY.NATURE SCIENCE,1987(3).
Authors:Wang Dingyi
Institution:Wang Dingyi
Abstract:This paper presents a new algorithm for real-time automatic generation control (AGC) of hydropower plants, in which the dynamic programming and equal incre-mental principle are integrated. A xnethod of the so-called "priority indices of start/stop" is used to determine which units ought to be put into operation. The application of the algorithm in hydropower plants is described.
Keywords:Power generation  Dynamic programming  Optimization  Real-time control  Computer control  Operation of hydropower plants  Control algorithm  
本文献已被 CNKI 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号