70 m PC整孔预制箱梁施工关键技术分析
引用本文:王通,王毓晋,宋杰,吴方钰.70 m PC整孔预制箱梁施工关键技术分析[J].盐城工学院学报(自然科学版),2020,33(1):43-49.
作者姓名:王通  王毓晋  宋杰  吴方钰
作者单位:浙江舟山北向大通道有限公司, 浙江 舟山 316000,浙江舟山北向大通道有限公司, 浙江 舟山 316000,中铁大桥局集团第二工程有限公司, 江苏 南京 210015,浙江大学 建筑工程学院, 浙江 杭州 310058
摘    要:以主通道项目非通航孔桥70 m PC箱梁为背景,利用BIM技术对预制场布局合理划分,优化海工混凝土配合比,采用钢筋模块化生产、内模滑移式设计、自动喷淋养护技术等方式极大提高了箱梁预制工效。深入分析大跨度PC箱梁预拱度设置,建立了边、中跨的预拱度函数曲线,指导了箱梁预制施工。自主研发1 200 t通用门式起重机,可适应场地大纵坡的不利影响,提升箱梁场内搬运效率。借助信息化手段对箱梁海上运输实时监控,保障了海上运输的安全。箱梁海上安装的关键在于吊具,设计了一种自重轻、结构简单的下托梁杆结构。通过ANSYS进行最不利受力分析,验证了吊具受力合理、强度、刚度及稳定性均满足要求。

关 键 词:70  m  PC箱梁  整孔预制  场内转运  预拱度
收稿时间:2019/9/4 0:00:00

Key Technology Analysis of 70 Meters PC Whole Hole Precast Box Girder Construction
WANG Tong,WANG Yujin,SONG Jie and WU Fangyu.Key Technology Analysis of 70 Meters PC Whole Hole Precast Box Girder Construction[J].Journal of Yancheng Institute of Technology(Natural Science Edition),2020,33(1):43-49.
Authors:WANG Tong  WANG Yujin  SONG Jie and WU Fangyu
Institution:Zhejiang Zhoushan Northward Channel Co., Ltd., Zhoushan Zhejiang316000, China,Zhejiang Zhoushan Northward Channel Co., Ltd., Zhoushan Zhejiang316000, China,China Railway Bridge Bureau Group Second Engineering Co., Ltd., Nanjing Jiangsu210015, China and College of Civil Engineering and Architecture, Zhejiang University, Hangzhou Zhejiang310058, China
Abstract:Taking 70 meters PC box girder of non-navigable hole bridge of the main channel project as the background, the prefabrication site layout is reasonably divided by using BIM technology, the mixing ratio of Marine concrete is optimized, and the prefabrication efficiency of box girder is greatly improved by means of modular production of reinforcement, sliding design of internal mold and automatic spray curing technology. Based on the analysis of the pre camber setting of long-span PC box girder, the pre camber function curve of side and middle span is established, which guides the construction of box girder prefabrication. Self developed 1 200 t universal gantry crane can adapt to the adverse effects of large longitudinal slope of the site and improve the efficiency of handling in the box girder field. With the help of information technology, the real-time monitoring of box girder maritime transportation ensures the safety of maritime transportation. The key to the offshore installation of box girder lies in the spreader. A lower joist structure with light weight and simple structure is designed. Through the most unfavorable stress analysis of ANSYS, it is verified that the spreader is reasonable in stress, strength, stiffness and stability meet the requirements.
Keywords:70 meters PC box girder  whole hole prefabrication  field transfer  pre-camber