首页 | 本学科首页   官方微博 | 高级检索  
     检索      

An Optimized Constraint Decomposition Method in Concurrent Engineering
作者姓名:常天庆  Xu Wensheng  Xiong Guangleng  Xing Siming
作者单位:[1]DepartmentofControlEngineering,AcademyofArmoredForceEngineering,Beijing100072,P.R.China [2]DepartmentofAutomation,TsinghuaUniversity,Beijing100084,P.R.China
基金项目:Supportedby 86 3/CIMS (No .2 0 0 1AA4 1114 0 )andtheNationalNaturalScienceFoundationofChina (No .6 0 10 4 0 0 8)
摘    要:In order to facilitate solution, a complex problem is normally decomposed into many small sub-problems during product development process. Teams are formed to resolve each sub-prob-lem. The original problem is resolved from solutions of sub-problems. Ideally, sub-problems are not only mutually independent but also inherent parameters of original problem. Solution of origi-nal problem can be directly derived from the collection of solutions from simplified sub-problems.In practice, the degree of interdependency is indeed reduced, sub-problems are neither totally in-dependent nor all inherent parameters of original problem. This paper discusses team coordination under this condition and design solution from each team, which not only satisfies total require-ments but also is an optimal one. The suggested optimized constraint deoomposition method will insure workable Pareto solution.

关 键 词:并行工程  约束满足问题  最优化  约束分解方法

An Optimized Constraint Decomposition Method in Concurrent Engineering
Xu Wensheng,Xiong Guangleng,Xing Siming.An Optimized Constraint Decomposition Method in Concurrent Engineering[J].High Technology Letters,2003,9(2):72-77.
Authors:Xu Wensheng  Xiong Guangleng  Xing Siming
Abstract:In order to facilitate solution, a complex problem is normally decomposed into many small sub-problems during product development process. Teams are formed to resolve each sub-problem. The original problem is resolved from solutions of sub-problems. Ideally, sub-problems are not only mutually independent but also inherent parameters of original problem. Solution of original problem can be directly derived from the collection of solutions from simplified sub-problems. In practice, the degree of interdependency is indeed reduced, sub-problems are neither totally independent nor all inherent parameters of original problem. This paper discusses team coordination under this condition and design solution from each team, which not only satisfies total requirements but also is an optimal one. The suggested optimized constraint decomposition method will insure workable Pareto solution.
Keywords:Constraint Satisfaction Problems  constraint decomposition  Concurrent Engineering  constraint management
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号