首页 | 本学科首页   官方微博 | 高级检索  
     检索      

浅谈呼图壁河流域梯级电站规划中泥沙问题
引用本文:胡俊德,胡源源.浅谈呼图壁河流域梯级电站规划中泥沙问题[J].中国西部科技,2010,9(6):8-9.
作者姓名:胡俊德  胡源源
作者单位:新疆昌吉水文水资源勘测局,新疆,昌吉,831100
摘    要:梯级电站各计算断面多处无水文资料,本文选用呼图壁河流域水文站资料,根据规划区内已有的泥沙资料情况,对流域泥沙来源、时空分布进行分析,并根据石门水文站泥沙资料采用模数法推求梯级电站各计算断面泥沙。

关 键 词:石门水文站  六个计算断面  泥沙情况

Brief Analysis Sand Problem in the Plan on Step Electricity Station of Hutubi Rive
HU Jun-de,HU Yuan-yuan.Brief Analysis Sand Problem in the Plan on Step Electricity Station of Hutubi Rive[J].Science and Technology of West China,2010,9(6):8-9.
Authors:HU Jun-de  HU Yuan-yuan
Institution:HU Jun-de HU Yuan-yuan (Changji Survey Branch of Hydrology , Water Resources in Xinjiang,Xinjiang 831100,China)
Abstract:Each calculate section in the step electricity station is a majority without hydrology data,this paper take datas on the hydrologic station of Hutubi river,according to the taked sand data situations in the plan area,analysis the source and space-time distribution of the river sand,and according to the sand datas of Shimen hydrology station,adopt modulus calculation to ascertain each calculate section sand data of the step electricity station.
Keywords:Shimen hydrology station  Six calculate sections  Sand situations  
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号