首页 | 本学科首页   官方微博 | 高级检索  
     检索      

三主桁84+84m连续钢桁梁桥正交异性整体钢桥面受力分析
引用本文:梅大鹏,叶梅新.三主桁84+84m连续钢桁梁桥正交异性整体钢桥面受力分析[J].中国西部科技,2008,7(34):1-2.
作者姓名:梅大鹏  叶梅新
作者单位:中南大学土木建筑学院,湖南,长沙,410075
摘    要:南京大胜关长江大桥是京沪高速铁路上一座六跨连续铁路钢桁梁(拱)桥,采用混凝土与钢正交异性板相结合的整体桥面,多横梁体系,钢正交异性板与下弦杆焊连在一起。本文主要研究了该桥边孔84+84m三主桁连续钢桁梁桥正交异性整体钢桥面板的受力情况。利用空间有限单元法,对桥面系部分构件的受力情况进行了分析。计算结果表明:该桥的整体桥面结构满足高速行车要求;桥面系各构件受力合理。

关 键 词:正交异性板  钢桁梁  多横梁体系  有限元法

The Analysis on Orthotropic Steel Bridge Deck of Three Main Truss 84 +84 m Continuous Steel Truss Bridge
MEI Da-peng,YE Mei-xin.The Analysis on Orthotropic Steel Bridge Deck of Three Main Truss 84 +84 m Continuous Steel Truss Bridge[J].Science and Technology of West China,2008,7(34):1-2.
Authors:MEI Da-peng  YE Mei-xin
Institution:(College of Civil and Architectural Engineering, Central South University, Changsha,410075,China)
Abstract:Nanjing Dashengguan Yangtse River Bridge is a six railway lines and three main truss girder(arch)bridge on the Beijing-Shanghai high-speed railway.It takes the form of ballast integral deck with the orthotropic steel deck and bottom chords being welded together.In this paper,we mainly study the analysis on orthotropic steel deck of Three mail truss 84 84m continuous steel truss bridge.we use the space finite element method to analysis and research the force situation on this orthotropic steel bridge deck.The results show that:The overall structure of the bridge deck meets the requirement of high-speed lane,and the force situation on every components of this bridge is reasonable.
Keywords:orthotropic plate  steel truss  multi-beam system  finite element method
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号