流水施工组织的工期计算 |
| |
引用本文: | 张晓天.流水施工组织的工期计算[J].宁夏工学院学报,1996,8(4):39-44. |
| |
作者姓名: | 张晓天 |
| |
摘 要: | 本文通过实例着重探讨在流水施工中各种情况的工期计算方法。
|
关 键 词: | 流水施工组织 工期 流水节拍 施工组织 |
Calculations on Time Limit for the Flow Construction Organization |
| |
Authors: | Zhang Xiao Tian |
| |
Institution: | Civil Engineering Department of Ningxia Institute of Technology |
| |
Abstract: | This paper approaches emphatically the calculation method for time limit of flow construction by living examples under various circumstances. |
| |
Keywords: | Flow construction organization Time limit Flow metre Flow step disance |