首页 | 本学科首页   官方微博 | 高级检索  
     检索      

工程量清单计价模式下招投标研究
引用本文:褚振文.工程量清单计价模式下招投标研究[J].合肥工业大学学报(自然科学版),2007,30(5):616-619.
作者姓名:褚振文
作者单位:安徽建筑工业学院,土木工程系,安徽,合肥,230601
摘    要:文章分析了业主和承包商在工程量清单计价模式下各自存在的问题,并提出了解决问题的方法。如业主在招标时工程量清单应如何编制;承包商在投标时,应如何分析业主和自身的实际情况,合理运用工程量清单投标技巧,控制造价,在最合理的情况下中标。

关 键 词:工程量清单  招标与投标  存在问题  解决方法
文章编号:1003-5060(2007)05-0616-04
修稿时间:2006年10月16

Research on invitation to bid and bidding under the mode of valuation with the bill of quantities
CHU Zhen-wen.Research on invitation to bid and bidding under the mode of valuation with the bill of quantities[J].Journal of Hefei University of Technology(Natural Science),2007,30(5):616-619.
Authors:CHU Zhen-wen
Abstract:The questions occurring in the bill of quantities provided by the owner under the mode of valuation with the bill of quantities as well as the causes are discussed,and the solving measures are introduced.Aiming at the questions occurring in biding and the causes,the corresponding solving methods are presented in detail.The contractor shall analyze the actual conditions of the owner and the enterprise,use the bidding skills rationally and control the cost of the project,thus winning a bid in a situation that it is rational.
Keywords:bill of quantities  invitation to bid and bidding  existing question  solving measure
本文献已被 CNKI 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号