首页 | 本学科首页   官方微博 | 高级检索  
     检索      

地质建模中基于响应面代理的不确定性研究
引用本文:孙立春,郭丽娜,何娟,吴梦阳,倪军娥.地质建模中基于响应面代理的不确定性研究[J].西南石油大学学报(自然科学版),2014,36(1):65-73.
作者姓名:孙立春  郭丽娜  何娟  吴梦阳  倪军娥
作者单位:中海油研究总院,北京东城100027
基金项目:国家重大专项“西非、亚太及南美典型油气田开发关键技术研究”(2011ZX05030–005)
摘    要:针对应用随机地质建模技术进行不确定性分析中的难点问题,提出了使用响应面代理模型进行不确定分析的
方法及其研究流程;分析了此方法应用过程中的关键点,即根据地质特征,充分考虑各建模环节的不确定性,开展敏感
性参数分析,应用响应面方法建立代理模型,生成训练/验证模型及应用代理模型进行结果预测时采样算法的要求。基
于代理模型的预测结果,可方便地得到定量评价参数相对真实的概率分布。在此基础之上,筛选对应于某一概率下的
随机地质模型,有助于进一步定量评价油田开发风险与潜力,为开发方案的编制及优化服务。

关 键 词:随机地质建模  响应面  代理模型  不确定性  地质模型  概率  

Uncertainty Analysis with the Response-surface Proxy for Stochastic Geological Models
Sun Lichun,Guo Lina,He Juan,Wu Mengyang,Ni Jun′e.Uncertainty Analysis with the Response-surface Proxy for Stochastic Geological Models[J].Journal of Southwest Petroleum University(Seience & Technology Edition),2014,36(1):65-73.
Authors:Sun Lichun  Guo Lina  He Juan  Wu Mengyang  Ni Jun′e
Institution:CNOOC Research Institute,Dongcheng,Beijing 100027,China
Abstract:To solve the difficulty problems,which the stochastic geological model is uncertain,the paper presented the
response-surface proxy model to carried out the uncertainties method and its research process. The uncertainties with the
geomodel can’t be easily and correctly disclosed with respect to the process of the stochastically modeling that is limited by
computer’s capacity and time consumption. In the whole process,some following crucial things should be considered seriously.
All uncertainties with the geomodeling should be fully taken into account in compliance with the geological characteristics
of reservoirs. Sensitivity analysis would be carried out prior to the generating of proxy model. The sampling algorithms for
generating both the training and the validation models could be different from the predicating of the target through proxy model.
The probabilistic distribution of the target variables(oil in place as an example)can be understood through proxy model to a
great extent. Therefore,these stochastic geomodels can be picked out with respect to the probabilities in terms of the target. In
this sense,risks and potentials for the development of a reservoir can be appraised further based on the uncertainty studies.
Keywords:stochastically geomodeling  response surface  proxy  uncertainty  geomodel  probability  
本文献已被 CNKI 等数据库收录!
点击此处可从《西南石油大学学报(自然科学版)》浏览原始摘要信息
点击此处可从《西南石油大学学报(自然科学版)》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号