首页 | 本学科首页   官方微博 | 高级检索  
     检索      

电厂地基处理方案的比较
引用本文:左萍梅.电厂地基处理方案的比较[J].科技情报开发与经济,2007,17(22):294-295.
作者姓名:左萍梅
作者单位:山西省电力勘测设计院,山西太原,030001
摘    要:根据大型火力发电厂主厂房对地基处理的要求及工程地质条件,对打入(静压)式钢筋混凝土预制桩、钢筋混凝土灌注桩、人工挖孔灌注桩等桩型进行了比较。

关 键 词:地基处理  打入(静压)式钢筋混凝土预制桩  火力发电厂
文章编号:1005-6033(2007)22-0294-02
收稿时间:2007-05-25
修稿时间:2007年5月25日

The Comparison of Foundation Treatment Schemes of Electronic Power Plant
ZUO Ping-mei.The Comparison of Foundation Treatment Schemes of Electronic Power Plant[J].Sci-Tech Information Development & Economy,2007,17(22):294-295.
Authors:ZUO Ping-mei
Institution:ZUO Ping-mei
Abstract:According to the requirements of the main workshops of large scale thermal power plant for the foundation treatment and the geological condition of the engineering, this paper compares some pile types of the driven-in (static pressure) prefabricated reinforced concrete piles reinforced concrete cast-in-place pile and manual cast-in-place caisson, etc.
Keywords:foundation treatment  driven-in (static pressure) prefabricated reinforced concrete pile  thermal power plant
本文献已被 CNKI 维普 万方数据 等数据库收录!