九架棚大桥连续刚构0号段施工技术综述
引用本文:阎明东.九架棚大桥连续刚构0号段施工技术综述[J].科技情报开发与经济,2008,18(31):199-201.
作者姓名:阎明东
作者单位:中铁十九局集团公司第五工程有限公司,辽宁大连,116100
摘    要:以九架棚大桥连续刚构0号段施工为例,综述了其施工要点,同时介绍了全过程的施工难点和注意事项。

关 键 词:连续刚构  施工技术  九架棚大桥

Abstract on the Construction Techniques Adopted in No.0 Section of the Continuous Rigid Frame of Jiujiapeng Bridge
YAN Ming-dong.Abstract on the Construction Techniques Adopted in No.0 Section of the Continuous Rigid Frame of Jiujiapeng Bridge[J].Sci-Tech Information Development & Economy,2008,18(31):199-201.
Authors:YAN Ming-dong
Institution:YAN Ming-dong
Abstract:Taking No.0 section of the continuous rigid frame of Jiujiapeng Bridge as the example,this paper sums up the main points of the construction of this section,and introduces some difficulties of the whole construction and some matters needing attention in the construction.
Keywords:continuous rigid frame  construction technique  Jiujiapeng Bridge